Laserfiche WebLink
ABBREVIATIONS <br />& <br />AND <br />@ <br />AT <br />FEET (FOOT) <br />INCH (INCHES) <br /># <br />POUND(S), NUMBER <br />= <br />EQUAL(S) <br />A.B. <br />ANCHOR BOLT <br />ABV. <br />ABOVE <br />ADD. <br />ADDITIONAL <br />ADJ. <br />ADJACENT <br />ALUM. <br />ALUMINUM <br />ALT. <br />ALTERNATE <br />APPROX. <br />APPROXIMATELY) <br />ARCH. <br />ARCHITECT(URAL) <br />ASSY. <br />ASSEMBLY <br />B. (BTM.) <br />BOTTOM <br />BEL. <br />BELOW <br />BEN <br />BOUNDARY EDGE NAILING <br />B.F. <br />BRACED FRAME <br />BLDG. <br />BUILDING <br />BLK.(G.) <br />BLOCK (ING) <br />BLW. <br />BELOW <br />BM. <br />BEAM <br />BMU <br />BRICK MASONRY UNIT <br />BN <br />BOUNDARY NAILING <br />BNDRY. <br />BOUNDARY <br />B.O. <br />BOTTOM OF <br />B.O.E. <br />BOTTOM OF EXCAVATION <br />B.O.F. <br />BOTTOM OF FOOTING <br />BRDG. <br />BRIDGE, BRIDGING <br />BRIG. <br />BEARING <br />BTWN. <br />BETWEEN <br />C <br />CAMBER <br />LAMB. <br />CAMBERED) <br />CANT. <br />CANTILEVER(ED) <br />OF <br />CUBIC FOOT <br />C.I.P. <br />CAST IN PLACE <br />C.J. <br />CONSTRUCTION JOINT <br />CL <br />CENTER LINE <br />CLG. <br />CEILING <br />CLR. <br />CLEAR <br />COL. <br />COLUMN <br />CONC. <br />CONCRETE <br />CONN. <br />CONNECTION <br />CONST. <br />CONSTRUCTION <br />CONT. <br />CONTINUOUS <br />CTSK. <br />COUNTERSINK <br />CTR. <br />CENTER(ED) <br />CY <br />CUBIC YARD <br />CMU <br />CONCRETE MASONRY UNIT <br />d <br />PENNY (NAILS) <br />DB <br />DROPPED BEAM <br />DBA <br />DEFORMED BAR ANCHORS <br />DBL. <br />DOUBLE <br />DCW <br />DEMAND CRITICAL WELD <br />DEPT, <br />DEPARTMENT <br />DET. <br />DETAIL <br />DF <br />DOUGLAS FIR <br />DIA. / 0 <br />DIAMETER <br />DIAG. <br />DIAGONAL <br />DIAPH. <br />DIAPHRAGM <br />DIM. <br />DIMENSION <br />DN. <br />DOWN <br />D.O. <br />DITTO (REPEAT) <br />DR <br />DEEP <br />D.S. <br />DRAG STRUT <br />DWG. <br />DRAWING(S) <br />DWL. <br />DOWELS(S) <br />(E) <br />EXISTING <br />EA. <br />EACH <br />E.E. <br />EACH END <br />E.F. <br />EACH FACE <br />E.J. <br />EXPANSION JOINT <br />EL. <br />ELEVATION <br />ELEV. <br />ELEVATOR <br />EMBD. <br />EMBED(MENT) <br />EN <br />EDGE NAIL <br />ENG. <br />ENGINEER <br />EQ. <br />EQUAL <br />EQPT. <br />EQUIPMENT <br />E.W. <br />EACH WAY <br />EXP. <br />EXPANSION <br />EXST. <br />EXISTING <br />EXT. <br />EXTERIOR <br />ABBREVIATIONS <br />ABBREVIATIONS <br />FAB. <br />FABRICATION <br />PAR. <br />PARALLEL <br />FB <br />FLUSH BEAM <br />P/C <br />PRECAST <br />PON, <br />FOUNDATION <br />PEN <br />PANEL EDGE NAIL <br />F.F. <br />FINISH FLOOR <br />PERP. <br />PERPENDICULAR <br />FIN. <br />FINISHED) <br />PL. <br />PLATE <br />FLG. <br />FLANGE <br />PL <br />PROPERTY LINE <br />FLR. <br />r <br />IrL00R <br />PLMBG. <br />PLUMBING <br />FN <br />FIELD (FACE) NAIL <br />PLYWD. <br />PLYWOOD <br />F.O. <br />FINISHED OPENING <br />PSF <br />POUNDS PER SQUARE FOOT <br />F.C.C. <br />FACE OF CONCRETE <br />PSI <br />POUNDS PER SQUARE INCH <br />F.O.M. <br />FACE OF MASONRY <br />P.T. <br />PRESERVATIVE TREATED <br />F.O.S. <br />FACE OF STUD <br />PT <br />POST TENSoON'ED' <br />t ) <br />F.O.W. <br />FACE OF WALL <br />FRM. <br />FRAME (FRAMING) <br />QTY. <br />QUANTITY <br />F.S. <br />FAR SIDE <br />FT. <br />FEET (FOOT) <br />R. (RAD.) <br />RADIUS <br />FRTW <br />FIRE RETARDANT TREATED WOOD <br />RE: (REF.) <br />REFERENCE <br />FTG, <br />FOOTING <br />REINF. <br />REINFORCEMENT <br />REQ. <br />REQUIRED <br />GA. <br />GAUGE <br />R.F. <br />RIGID FRAME <br />GALV. <br />GALVANIZE(D) <br />R.O. <br />ROUGH OPENING <br />GB. <br />GRADE BEAM <br />R.S. <br />ROUGH SAWN <br />GLB <br />GLUE LAMINATED BEAM <br />GRD. <br />GRADE <br />SCH. <br />SCHEDULE <br />GWB <br />GYPSUM WALLBOARD <br />SCHED. <br />SCHEDULE <br />GYP. <br />GYPCRETE <br />SOL <br />STRUCTURAL COMPOSITE WOOD <br />SHT. <br />SHEET <br />HD <br />HOLDOWN <br />SIM. <br />SIMILAR <br />H.D.G. <br />HOT DIPPED GALVANIZED <br />S.J. <br />SHRINKAGE CONTROL JOINT <br />HGR. <br />HANGER <br />SKW. <br />SKEW(ED) <br />HORIZ. <br />HORIZONTAL <br />S.O.G. <br />SLAB ON GRADE <br />HR <br />HEADER <br />SPC. <br />SPACE(S) (ING) <br />H.S.B. <br />HIGH STRENGTH BOLT <br />SPEC. <br />SPECIFICATIONS) <br />HT. <br />HEIGHT <br />SQ. <br />SQUARE <br />STD. <br />STANDARD <br />I.D. <br />INSIDE DIAMETER <br />STGR. <br />STAGGER <br />I.E. <br />INVERT ELEVATION <br />STIFF. <br />STIFFENER(S) <br />I.F. <br />INSIDE FACE <br />STIR. <br />STIRRUP(S) <br />IN. <br />INCH(ES) <br />STL. <br />STEEL <br />INFO. <br />INFORMATION <br />STRUC. <br />STRUCTURAL <br />INT. <br />INTERIOR <br />STRUCT. <br />STRUCTURAL <br />SUSP. <br />SUSPENDED(TION) <br />JST. <br />JOIST <br />SYMM. <br />SYMMETRICAL <br />JT. <br />JOINT <br />T. <br />TOP <br />K <br />KIPS (1000 LB.) <br />TAB. <br />TOP AND BOTTOM <br />TEMP. <br />TEMPORARY <br />LAT. <br />LATERAL <br />TAG. <br />TONGUE AND GROOVE <br />LB. <br />POUND(S) <br />THK. <br />THICK(NESS) <br />L.B. <br />LAG BOLTS(S) <br />THIRD. <br />THREADED <br />LG. <br />LONG(ITUDINAL) <br />TN <br />TOE NAIL <br />LGTH. <br />LENGTH <br />T.O.S. <br />TOP OF (STEEL) (SHEATHING) (SLAB) <br />LGMF. <br />LIGHT GAUGE METAL FRAMING <br />T.O.W. <br />TOP OF WALL <br />LLH <br />LONG LEG HORIZONTAL <br />TRANSV. <br />TRANSVERSE <br />LLV <br />LONG LEG VERTICAL <br />TYP. <br />TYPICAL <br />LSH <br />LONG SLOTTED HOLE(S) <br />L.W. <br />LIGHT WEIGHT <br />U.N.O. <br />UNLESS NOTED OTHERWISE <br />U/S <br />UNDERSIDE <br />MAT. <br />MATERIAL <br />MAX. <br />MAXIMUM <br />V. <br />VERTICAL <br />M.B. <br />MACHINE BOLT <br />VERT. <br />VERTICAL <br />MBM <br />METAL BUILDING MANUFACTURER <br />VIF <br />VERIFY IN FIELD <br />MECH. <br />MECHANICAL <br />M.E.J. <br />MASONRY EXPANSION JOINT <br />W. <br />WIDE (WIDTH) <br />MEZZ. <br />MEZZANINE <br />W/ <br />WITH <br />MFR. <br />MANUFACTURER <br />W/0 <br />WITHOUT <br />MIN. <br />MINIMUM <br />WD. <br />WOOD <br />MISC. <br />MISCELLANEOUS <br />W.H.S. <br />WELDED HEADED STUDS <br />MTL. <br />METAL <br />W.P. <br />WORK POINT <br />W.S. <br />WELDED STUD <br />N.L.B. <br />NON -LOAD BEARING <br />WT. <br />WEIGHT <br />NO. <br />NUMBER <br />W.W.F. <br />WELDED WIRE FABRIC <br />N.S. <br />NEAR SIDE <br />N.T.S. <br />NOT TO SCALE <br />X-STG <br />EXTRA STRONG <br />N.W.C. <br />NORMAL WEIGHT CONCRETE <br />XX-STG <br />DOUBLE EXTRA STRONG <br />O.C. <br />ON CENTER <br />YD <br />YARD <br />O.D. <br />OUTSIDE DIAMETER <br />O.F. <br />OUTSIDE FACE <br />O.H. <br />OPPOSITE HAND <br />OPNG. <br />OPENING <br />OPP. <br />OPPOSITE <br />ORNT. <br />ORIENTATION <br />OSB <br />ORIENTED STRAND BOARD <br />O.W.J. <br />OPEN WEB JOIST <br />Utility Conflict <br />CAUTION: <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH <br />OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT BY POTHOLING THE <br />UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION, <br />THIS SHALL INCLUDE CALLING UTILITY LOCATE AT 1-800-424-5555 AND THEN POTHOLING <br />ALL OF THE EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY <br />VERIFY WHETHER OR NOT CONFLICTS EXIST, LOCATIONS OF SAID UTILITIES AS SHOWN ON THESE <br />PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. <br />RESOLVE ANY PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. <br />DPROOF PERFORMED . LOCATIONS SELECTED BY THE <br />OTECHNICAL ENGINEER. ALL REQUIREDDATA ! •I r BY <br />i <br />J ENGINEER. TESTING r NAILS SHALLB.,' <br />•D UNTIL AIL <br />OUT AND ! f • AT LEAST 75 PERCENT OF I a+ SPECIFIED <br />DAY COMPRESSIVE h <br />IERE TEMPORARY CASING OF THE UNBONDED LENGTH OF TEST NAILS IS PROVIDED, THE <br />iING SHALL BE INSTALLED TO PREVENT ANY REACTION BETWEEN THE CASING AND THE <br />OUTIED .� <br />I �• <br />LENGTHiNAIL. <br />0 PROOF TESTING III , OF PRODUCTION NA <br />OOF TESTING SHALL BE PERFORMED ON 5 PERCENT OF THE PRODUCTION NAILS IN EACH <br />OTCRETE LIFT. THE LOCATIONi NUMBER f. ! tiDETERMINED <br />. r. I. <br />I <br />'OTECHNICAL ENGINEER. <br />OOF TEST NAILS SHALL HAVE BOTH BONDED.N • ORUNBONDED LENGTHS. PRIOR <br />ONLY THE BONDED LENGTH OF THE TEST NAIL•I ! <br />R DETERMINE I BONDED A�Bll ! X <br />R 'I • i I r I I °I � r •; • i I <br />I I . I I I! I I �: I I� I I I •I rl I I• I •' �• ti X I I I! r <br />, <br />Ir, '' II I •r I -1r' <br />'!�'; I• Ir I I I li �• I I • r Ir I i . ! � -I :1 <br />I. '" •�r•I r I I III r ' • ;I I� } I <br />�• � I I I I I I: I r I �� i- . - I I i f' I I �� •', Ir I I � i I� !� <br />I I • Ir <br />• . . !fir • � X r,• ,! <br />)AD HOLD TIME <br />(0.05 DTL MAX.)1 MINUTE OR UNTIL STABLE <br />?5 DTL 1 MINUTE OR UNTIL STABLE <br />50 DTL 1 MINUTE OR UNTIL STABLE <br />15 DTL 1 MINUTE OR UNTIL STABLE <br />)0 DTL 1 MINUTE OR UNTIL STABLE <br />?5 DTL 1 MINUTE OR UNTIL STABLE <br />50 DTL 10 MINUTES U.N.O. <br />=FER TO TEST NAIL ACCEPTANCE CRITERIA THUS SHEET <br />E ALIGNMENT LOAD (AL) SHOULD BE THE MINIMUM LOAD REQUIRED TO ALIGN THE TESTING <br />PARATUS AND SHOULD NOT EXCEED 5 PERCENT OF THE DESIGN TEST LOAD (DTL). DIAL <br />GES SHOULD BE SET AT "ZERO" AFTER THE ALIGNMENT LOAD HAS BEEN APPLIED. <br />- LOAD INCREMENTS SHALL BE MAINTAINED WITHIN 5-PERCENT OF THE INTENDED LOAD. <br />PENDING ON PERFORMANCE, EITHER 10-MINUTE OR 60-MINUTE CREEP TESTS SHALL BE <br />RFORMED AT THE MAXIMUM TEST LOAD. THE CREEP PERIOD SHALL START AS SOON AS THE <br />XIMUM TEST LOAD IS APPLIED AND MOVEMENTS SHALL BE RECORDED AT 10, 20, 30, 50 AND 60 <br />JUTES. REFER TO TEST NAIL ACCEPTANCE CRITERIA THIS SHEET. <br />902 - VERIFICATION TESTING OF NAILS (SN) <br />O SUCCESSFUL VERIFICATION TESTS SHALL BE PERFORMED IN EACH IDENTIFIED SOIL UNIT <br />OR TO, OR DURING THE START OF, INSTALLATION OF PRODUCTION NAILS IN THAT UNIT TO <br />RIFY THE INSTALLATION METHODS, SOIL CONDITIONS AND NAIL PULLOUT CAPACITY. THE <br />'ATION OF THE TESTS SHALL BE APPROVED BY THE GEOTECHNICAL ENGINEER OF RECORD. <br />R TEMPORARY CONSTRUCTION SHORING, SUCCESSFUL VERIFICATION NAILS MAY BE <br />ORPORATED AS PRODUCTION NAILS. REFER TO TEST NAIL ACCEPTANCE CRITERIA THIS <br />_ET. <br />ZIFICATION NAILS SHALL NOT BE INCORPORATED AS PERMANENT PRODUCTION NAILS UNLESS <br />'ROVED BY THE GEOTECHNICAL ENGINEER. <br />>T NAILS SHALL HAVE BOTH BONDED AND UNBONDED LENGTHS. PRIOR TO TESTING, ONLY <br />BONDED LENGTH OF THE TEST NAIL SHALL BE GROUTED. THE UNBONDED LENGTH OF THE <br />>T NAIL SHALL BE AT LEAST 3 FEET. THE BONDED LENGTH OF THE TEST NAILS SHALL BE <br />ERMINED BY THE GEOTECHNICAL ENGINEER BASED ON THE BAR GRADE AND SIZE SUCH <br />kT THE ALLOWABLE BAR STRUCTURAL LOAD IS NOT EXCEEDED, BUT SHALL NOT BE LESS <br />kN 10 FEET. THE ALLOWABLE BAR STRUCTURAL LOAD DURING TESTING SHALL NOT EXCEED <br />'ERCENT OF THE ULTIMATE STRENGTH FOR GRADE 150 BARS OR 80 PERCENT OF THE YIELD <br />LENGTH FOR GRADE 75 BARS. <br />: VERIFICATION TEST BONDED LENGTH Lbv SHALL NOT EXCEED THE TEST ALLOWABLE BAR <br />ZUCTURAL LOAD DIVIDED BY 2 TIMES THE DESIGN PULLOUT RESISTANCE: VALUE. THE <br />-LOWING EQUATIONS SHALL BE USED FOR DETERMINING THE TEST NAIL BOND LENGTH TO <br />)ID STRUCTURALLY OVERSTRESSING THE VERIFICATION NAIL: <br />= C*Fy*As / (2*Ad) FOR STEEL GRADE 75 <br />= C*Fu*As / (2*Ad) FOR STEEL GRADE 150 <br />ERE: <br />= MAXIMUM VERIFICATION TEST NAIL BOND LENGTH IN FEET. <br />NAIL BAR YIELD STRENGTH IN KSL <br />= NAIL BAR ULTIMATE TENSILE STRENGTH IN KSL <br />= NAIL BAR AREA IN SQUARE INCHES. <br />= DESIGN BOND (LOAD TRANSFER / PULLOUT RESISTANCE) IN KIPS/FT. <br />0.8 FOR GRADE 150 BARS AND 0.8 FOR GRADE 75 BARS. <br />: DESIGN TEST LOAD (DTL) DURING TESTING SHALL BE (Lb -Ad) <br />ERE: <br />AS -BUILT BONDED TEST LENGTH IN FEET. <br />= DESIGN BOND (LOAD TRANSFER / PULLOUT RESISTANCE) IN KIPS/FT. <br />ZIFICATION TEST NAILS SHALL BE INCREMENTALLY LOADED TO TWICE THE DESIGN TEST LOAD <br />L) FOLLOWED BY UNLOADING IN ACCORDANCE WITH THE FOLLOWING SCHEDULE. THE SOIL <br />L MOVEMENT SHALL BE RECORDED AT THE END OF THE HOLD TIME ASSOCIATED WITH EACH <br />REMENT OF LOADING AND UNLOADING. EACH UNLOAD INCREMENT SHALL BE HELD ONLY <br />Z A SUFFICIENT TIME TO ALLOW STABILIZATION OF THE MOVEMENT READING. <br />)ADRNG UNLOADING <br />AD HOLD TIME LOAD HOLD TIME <br />(0.05 DTL MAX.)1 MINUTE1.75 DTLUNTIL STABLE <br />5 DTL 10 MINUTES 1.50 DTLUNTIL STABLE <br />0 DTL 10 MINUTES 1.25 DTLUNTIL STABLE <br />5 DTL 10 MINUTES 1.00 DTLUNTIL STABLE <br />0 DTL 10 MINUTES 0.75 DTLUNTIL STABLE <br />5 DTL 10 MINUTES 0.50 DTLUNTIL STABLE <br />0 DTL 60 MINUTES 0.25 DTLUNTIL STABLE <br />`5 DTL 10 MINUTES AL UNTIL STABLE <br />0O DTL 10 MINUTES <br />: ALIGNMENT LOAD (AL) SHOULD BE THE MINIMUM LOAD REQUIRED TO ALIGN THE TESTING <br />'ARATUS AND SHOULD NOT EXCEED 5 PERCENT OF THE DESIGN TEST LOAD (DTL). DIAL <br />,ES SHOULD BE SET AT "ZERO" AFTER THE ALIGNMENT LOAD HAS BEEN APPLIED. ALL LOAD <br />REMENTS SHALL BE MAINTAINED WITHIN 5-PERCENT OF THE INTENDED LOAD. REFER TO <br />;T NAIL ACCEPTANCE CRITERIA THIS SHEET. <br />r ' <br />I 1- I , I i •' I I, �.: • I I p. ri 1 - -' t�, p ,„� ��.� F, a <br />I <br />•:. • I II I I I I I I I I I I <br />~, <br />I I I <br />� I- ,41• I fi r- i t I I I ' <br />I - <br />, <br />I I I FYg� �• �� <br />I� I I Ir f� • I I I I I I � ! C�'�� � 'r1 �%� <br />I • LI _ <br />• <br />I I i I I I� I !' I f �•��• <br />• r I I �I •: ! I I I I I lt:�� �, � <br />I <br />I r I . I <br />I <br />�y <br />r r I I IP. <br />WE <br />Ir I i i I I I I I I I ! I. I' I I I • •" <br />I I <br />I .;I ,- •I �, III ,llr I: 'i <br />f M1 <br />t I- -• I � I� I II II I I I �. <br />. �I � 5 �a*S:;x„ � „ �Y� a r.:-�'"'Swv;"•�' n'a"`v�,�.,;�s,°,.4 .:�:. �t�,'a,�.'�, .�"*`�"�`r.'�'i <br />I <br />a- <br />,r ,r'� I ��� I I ,I' I I'I IrI II :r I �� � • I I -t Ir �I III !I `I �� <br />XI i I I-' I �'�.I �1 I! ill I -I� a. 'I •"I I � •' I- <br />F� <br />� ,! - •r11 I � e <br />s <br />LI I IX �•. ! .I . 4I I X � -. <br />a. <br />ps <br />E , <br />4 <br />r � i, I , ! h . ;; • - , Ir � 1, • ,:, �. �? �,���� �` <br />I <br />4.. s <br />Utz <br />t <br />ITY O! VEImo.E` T <br />t'� Irr' <br />DATE: 10-20-2020 <br />JOB NO. 19-48 <br />FERMT NO. B2000-044 <br />REVISIONS: <br />DATE DESCRIPTION <br />ISSUE: <br />SHORING/EX 05/08/20 <br />SHOR/EX REV 09/24/20 <br />SHOO/EX REV2 10/20/20 <br />