Laserfiche WebLink
1/24/2020 Page 1 <br /> City of Everett <br /> 9:48:44AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. CW 1910-003 Site Address 4924 DOGWOOD DR <br /> Applied 10/9/2019 Applicant ROB STANNIK Lot <br /> Approved 11/25/2019 Owner BJARNASON LINDA I/JANSEN-HUNT PAULINE Block <br /> Issued 11/25/2019 Contractor Tract <br /> Parent Permit No. W1909-009 Description DAYLIGHT BASEMENT REMODEL <br /> Notes SEPARATE ELECTRICAL PERMIT REQUIRED <br /> Scheduled Completed Tvne Inspector Result Remarks Inspector's Comments <br /> 12/2/2019 12/2/2019 PLUMB SDP APPROVAL 425-905-9836 <br /> 03-ROUGH IN <br /> (12/2/2019 1:29 PM SDP) <br /> Plumbing is mostly existing with a few <br /> replacements.Fixture locations remain the <br /> same. <br /> 12/2/2019 12/2/2019 MECH 04-ROUGH SDP APPROVAL (12/2/2019 2:55 PM SDP) <br /> IN Upgrades on bath and stove exhaust, <br /> furnace is electric. <br /> 12/9/2019 12/9/2019 BLDG DWF APPROVAL 425-905-9836 <br /> 08-FRAMING <br /> (12/9/2019 10:41 AM DWF) <br /> Basement-ok to insulate. <br /> Patio guard-railing correction-not an <br /> approved support design. <br /> 12/10/2019 12/10/2019 BLDG DWF APPROVAL 425-905-9836 <br /> 11-INSULATION <br /> (12/10/2019 9:29 AM DWF) <br /> Ok to complete drywall patching. <br /> Note: Correction-Bathroom ceiling needs <br /> to have 5/8"green board to span 16" <br /> 1/9/2020 1/9/2020 BLDG 15-FINAL DWF NOT READY PM inspection requested <br /> Brady:425-905-9836 <br /> (1/9/2020 11:39 AM DWF) <br /> Need-Mechanical,plumbing and electrical <br /> finals before building final inspection. <br /> Need to install handrailing on patio deck. <br /> Complete infill at landing for fall <br /> protection. <br /> Interior stairway needs to have handrailing <br /> extended noising to noising and returns. <br /> 1/14/2020 1/14/2020 PLUMB 06-FINAL SDP APPROVAL <br /> 1/14/2020 1/14/2020 MECH 06-FINAL SDP APPROVAL <br /> 1/15/2020 1/15/2020 BLDG 15-FINAL DWF CORRECTION (1/15/2020 12:30 PM DWF) <br /> Need Electrical Final. <br /> Building - complete install of hand <br /> railing,stairway off patio deck. <br /> Install CO dectectors in common ares each <br /> floor level. <br /> Insulate floor above storage room R30 as <br /> per plans. <br /> 1/23/2020 1/23/2020 BLDG 15-FINAL DWF APPRVD-PERN Brady:425-905-9836 <br /> 1/23/2020 1/23/2020 ADMIN USE HPC APPROVAL <br /> ONLY** <br /> INSP12 <br />