My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6624 EVERGREEN WAY BJS AUTOMOTIVE 2022-06-28
>
Address Records
>
EVERGREEN WAY
>
6624
>
BJS AUTOMOTIVE
>
6624 EVERGREEN WAY BJS AUTOMOTIVE 2022-06-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2022 9:30:34 AM
Creation date
6/28/2022 9:30:19 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
6624
Tenant Name
BJS AUTOMOTIVE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> ypCorrection 1 : <br /> fE <br /> The drawings and picture show and state the oil heater is on an 8ft stand,the oil burning stove is a "Clean Burn <br /> I `; Stove" product. I have attached an image of the label on the side of the stove. <br /> 'p I have provided the sticker and label that shows the specifications of the stove.This meets the requirements listed <br /> under the IMC 922.1 and NFPA 31 and UL896. <br /> 2. <br /> I have attached the drawings of the stove per request on the correction letter.The drawings attached have the <br /> specifications listed on how the stove was installed. <br /> The heater is on a stand that is 8 foot per requirement (holding the heater off the ground 8ft)the heater and stand <br /> have self drilling sheet metal screws attached to the heater which attach the heater and stand together. The <br /> clearance of the stand is 36inches on the sides of the unit and on 2 foot to the rear for maintenance. <br /> � f <br /> Oil heater is located in the right back of the building per the drawings. <br /> I ; <br /> 3. <br /> The roof material and penetration is a double wall insulated Chimney pipe that has a clapp cleanout installed, 2 foot <br /> clearance between the pipe and roof truss.The Chimney pipe is secured with Wall Band on the wall leading to the <br /> roof sheeting that was cut back to 4 inches to allow the clearance of the Chimney pipe.There is a 2X4 headout <br /> between the roof members.There is a storm collar and roof jack on the outside if the building located on the roof at <br /> the outside Chimney pipe. <br /> ( E <br /> 4. <br /> The heater is secured to the floor with anchor bolts that are 3/8. <br /> I I We have addressed all corrections. <br /> I <br /> I also have pictures that will be sent in right after this email just in case there is not enough space to send. <br /> g <br /> I am also concerned that there is no heat in the building and the employees are currently freezing as the other <br /> heaters in the building are located and in control of Rae's Autobody who is currently keeping the bay door in the <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.