Laserfiche WebLink
6/16/2022 Page 1 <br /> City of Everett <br /> 3:50:02PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C 1910-008 Site Address 4111 FEDERAL AVE <br /> Applied 10/8/2019 Applicant SHAFER LARRY Lot <br /> Approved 12/6/2019 Owner DEMPSEY DENNIS K Block <br /> Issued 12/9/2019 Contractor BETTER BILT REMODELING Tract <br /> Parent Permit No. Description CHANGE ATTACHED GARAGE TO LIVING SPACE <br /> Notes <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 12/12/2019 12/12/2019 BLDG DWF OTHER (12/12/2019 10:24 AM DWF) <br /> 08-FRAMING Consultation for framing and <br /> need electrical RI sign off before framing <br /> inspection. <br /> 12/20/2019 12/20/2019 BLDG DWF PARTIALAPPR Larry:206-913-1277 <br /> 08-FRAMING <br /> (12/20/2019 10:21 AM DWF) <br /> Under floor framing only,ok to complete <br /> insulation- R30+rigid foam. <br /> Then ok to cover,floor sheeting. <br /> 1/9/2020 1/9/2020 MECH 04-ROUGH SDP APPROVAL except attic (1/9/2020 1:54 PM SDP) <br /> IN Ok to cover walls,recall for attic access. <br /> Note:The ductless heat pump will not be <br /> installed on this project. <br /> 1/9/2020 1/9/2020 PLUMB SDP APPROVAL Larry:206-913-1277 <br /> 03-ROUGH IN <br /> (1/9/2020 1:52 PM SDP) <br /> ok to cover walls,recall for attic inspection <br /> (can be done at final)please have a ladder <br /> on site for access. <br /> 1/9/2020 1/9/2020 BLDG DWF PARTIAL APPR Larry:206-913-1277 <br /> 11-INSULATION <br /> (1/9/2020 11:04 AM DWF) <br /> Need Electrical rough in sign off before <br /> cover. <br /> Note:provide a copy of insulation <br /> certificate at building final. <br /> 1/17/2020 1/17/2020 BLDG DWF APPROVAL <br /> 09-DRYWALL <br /> 2/4/2020 2/4/2020 MECH 06-FINAL SDP CORRECTION Complete exhaust <br /> fan ducting <br /> 2/4/2020 2/4/2020 PLUMB 06-FINAL SDP APPROVAL Larry:206-913-1277 <br /> 2/4/2020 2/4/2020 BLDG 15-FINAL KMK CORRECTION Call for elec final Larry:206-913-1277 <br /> E1911-123 <br /> (2/4/2020 9:57 AM KMK) <br /> Please call for an electrical final and then <br /> building final. <br /> 2/18/2020 2/18/2020 MECH 06-FINAL TMB APPROVAL <br /> 11/4/2020 11/4/2020 PERMIT KLC EXTENSION A COVID <br /> EXTENSION EXTENSION <br /> 5/7/2021 5/7/2021 PERMIT KLC EXTENSION A COVID <br /> EXTENSION EXTENSION <br /> INSP12 <br /> srEs <br />