Laserfiche WebLink
4/20/2022 Page 1 / 1 <br /> 6:39:311M City of Everett <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E2106-216 Site Address 2105 JEFFERSON PL <br /> Applied 6/28/2021 Applicant Dan-en Maybruck Lot <br /> Approved 6/29/2021 Owner GEBREHANNA TEOWDROS NEGASH Block <br /> Issued 6/29/2021 Contractor PREMIER ELECTRICAL SRVCS INC Tract <br /> Parent Permit No. B2103-002 Description 200 amp upgrade&circuits <br /> Notes 200 amp upgrade(like for like)in same location with up to 8 curcuits <br /> Scheduled Completed Tune Inspector Result Remarks Inspector's Comments <br /> 7/12/2021 7/12/2021 ELEC 06-ROUGH TJJO NOT READY eTRAKiT Inspection 7/9/2021 5:06 PM Darren Maybruck <br /> IN Request 200 amp panel upgrade,no location change <br /> plus branch circuits.Afternoon inspection <br /> requested by owner. <br /> Contact Name:Teo Gebrehanna <br /> Site Address:2105 JEFFERSON PL <br /> Phone:4253660288 <br /> e-Mail:darrenm@premierelectricalsvc.com <br /> 7/12/2021 7/12/2021 ELEC 05-SERVICE TJJO NOT READY eTRAKiT Inspection 7/9/2021 5:06 PM Darren Maybruck <br /> Request 200 amp panel upgrade,no location change <br /> plus branch circuits.Afternoon inspection <br /> requested by owner. <br /> Contact Name:Teo Gebrehanna <br /> Site Address:2105 JEFFERSON PL <br /> Phone:4253660288 <br /> e-Mail:darrenm@premierelectricalsvc.com <br /> 7/13/2021 7/13/2021 ELEC 05-SERVICE TJJO APPROVAL eTRAKiT Inspection 7/12/2021 3:58 PM Darren Maybruck <br /> Request <br /> Contact Name:Darren Maybruck <br /> Site Address:2105 JEFFERSON PL <br /> Phone:3604215230 <br /> e-Mail:darrenm@premierelectricalsvc.com <br /> (7/13/2021 1:51 PM TJJO) <br /> Service approved <br /> 7/13/2021 7/13/2021 ELEC 06-ROUGH TJJO APPROVAL (7/13/2021 1:51 PM TJJO) <br /> IN Rough in approved <br /> Talked to homeowner about temp light <br /> removal and j boxes depending on <br /> insulation prior to final <br /> 1/5/2022 1/5/2022 ELEC 09-FINAL TJJO CORRECTION TEO <br /> 425-366-0288 <br /> (1/5/2022 11:19 AM TJJO) <br /> -#10 awg nm cable can not be landed on 40 <br /> amp breaker <br /> -complete panel schedule <br /> -afci protection required for altered,added <br /> circuits as well as ones with new devices <br /> -gfci protection for dryer/new range? <br /> -receptacles need to be secure to boxes <br /> -tamper resistant receptacles required where <br /> new receptacles added <br /> -nm cable may not be ran exposed in <br /> cabinet <br /> -36"of clearance required for electrical <br /> panel <br /> -Remove stove in wet bar area or work with <br /> planning department on adding additional <br /> kitchen to prints(if choosing to keep <br /> provide load calc for service,if removing <br /> remove receptacle and breaker) <br /> INSP12 <br /> CRWsYs <br />