My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
605 MAULSBY LN 2022-06-29
>
Address Records
>
MAULSBY LN
>
605
>
605 MAULSBY LN 2022-06-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2022 8:15:19 AM
Creation date
6/29/2022 8:15:16 AM
Metadata
Fields
Template:
Address Document
Street Name
MAULSBY LN
Street Number
605
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6/23/2022 Page 1 <br /> City of Everett <br /> 10:30:51AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. M2003-004 Site Address 605 MAULSBY LN <br /> Applied 3/2/2020 Applicant WASHINGTON ENERGY SVCS CO LLC Lot <br /> Approved 3/2/2020 Owner OVERSTREET B Block <br /> Issued 3/2/2020 Contractor WASHINGTON ENERGY SVCS CO LLC Tract <br /> Parent Permit No. Description INSTALLING FURNACE. <br /> Notes INSTALLING FURNACE. <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 9/25/2020 9/25/2020 PERMIT KLC APPROVAL COVID 19 <br /> EXTENSION EXTENSION <br /> 3/17/2021 3/17/2021 PERMIT KLC EXTENSION A COVID <br /> EXTENSION EXTENSION <br /> 7/20/2021 7/20/2021 PERMIT KLC EXTENSION A COVID <br /> EXTENSION EXTENSION <br /> INSP12 C SYSTEP S <br />
The URL can be used to link to this page
Your browser does not support the video tag.