Laserfiche WebLink
6/8/2022 Page 1 <br /> City of Everett <br /> 7:13:09AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E2205-234 Site Address 508 ROSE WAY <br /> Applied 5/27/2022 Applicant ARROW INSULATION INC Lot <br /> Approved 5/27/2022 Owner SIMONTON DANIEL&SHEPHERD ALINA Block <br /> Issued 5/31/2022 Contractor ARROW INSULATION INC Tract <br /> Parent Permit No. Description K&T Rewire and Panel swap <br /> Notes Rewiring knob and tube.Swapping out panel. <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 6/1/2022 6/1/2022 ELEC 05-SERVICE SKB APPROVAL as noted 5/31/2022 8:44 AM ARROW <br /> INSULATION INC <br /> This home is currently occupied and if <br /> possible we'd like the reconnect to be by the <br /> end of the day on 5/31. <br /> Contact Name:ARROW INSULATION <br /> INC <br /> Site Address:508 ROSE WAY <br /> Phone:2066829276 <br /> e-Mail:jennifer@arrowconservation.com <br /> (6/1/2022 1:03 PM SKB) <br /> Contractor installing a jumper from the <br /> grounded bus to the equipment ground bus. <br /> Contractor installing a water jumper were <br /> metal is isolated by plastic in laundry area. <br /> 6/7/2022 6/7/2022 ELEC 10-FINAL SKB APPRVD-PERN eTRAKiT Inspection 6/1/2022 8:57 AM ARROW INSULATION <br /> Request INC <br /> Contact Name:Ivan Prado <br /> Site Address:508 ROSE WAY <br /> Phone:3603332664 <br /> e-Mail:jennifer@arrowconservation.com <br /> INSP12 CI A/SYSTLMS <br />