My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4517 SEAHURST AVE 2022-06-29
>
Address Records
>
SEAHURST AVE
>
4517
>
4517 SEAHURST AVE 2022-06-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2022 11:03:11 AM
Creation date
6/29/2022 11:02:47 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAHURST AVE
Street Number
4517
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/8/2021 Page 1 <br /> City of Everett z <br /> 6:38:34AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. PLW2102-006 Site Address 4517 SEAHURST <br /> Applied 2/22/2021 Applicant Sean Craig Lot <br /> Approved 3/3/2021 Owner Sean Craig Block <br /> Issued 3/11/2021 Contractor Sean Craig Tract <br /> Parent Permit No. BW2102-001 Description Hook up plumbing in basement <br /> Notes Installing clothes washer hookup,stand-up shower,toilet,and sink <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 3/12/2021 3/12/2021 PLUMB SDP CORRECTION eTRAKiT Inspection 3/11/2021 2:37 PM Sean Craig <br /> 03-ROUGH IN Request Owner will be on site. <br /> Contact Name:Sean Craig <br /> Site Address:4517 SEAHURST <br /> Phone:4258026819 <br /> e-Mail:sean.c.craig@protonmail.com <br /> (3/12/2021 1:30 PM SDP) <br /> All work must be exposed for inspection. <br /> See UPC 105.0 <br /> 3/16/2021 3/16/2021 PLUMB SDP CORRECTION (3/16/2021 1:35 PM SDP) <br /> 02-GROUND 1)2"waste line serving the upstairs can't tie <br /> into the downstairs horizontal wet vent.Re <br /> connect the upstairs waste line downstream <br /> of the horizontal wet vent section of the <br /> toilet and lay, under ground.recall the <br /> inspection when you are ready. <br /> 2)Perform a running test on the <br /> underground waste and vent pipes. <br /> 3/16/2021 3/16/2021 PLUMB SDP CORRECTION eTRAKiT Inspection 3/15/2021 6:58 PM Sean Craig <br /> 03-ROUGH IN Request <br /> Contact Name:Sean Craig <br /> Site Address:4517 SEAHURST <br /> Phone:4258026819 <br /> e-Mail:sean.c.craig@protonmail.com <br /> (3/16/2021 1:02 PM SDP) <br /> 1)2"waste line serving the upstairs can't tie <br /> into the downstairs horizontal wet vent.Re <br /> connect the upstairs waste line downstream <br /> of the horizontal wet vent section of the <br /> toilet and lay, under ground.recall the <br /> inspection when you are ready. <br /> 2)The hose bib must be secured in the wall <br /> in such a way to facilitate it's replacement <br /> without removing structual elements(wall <br /> board). <br /> 3)The vent serving the horizontal wet vent <br /> must be 2"throughout. <br /> 4)Perform a running test on the <br /> underground waste and vent pipes. <br /> 5)A shower pan liner test will be required. <br /> 6)The air admittance valves in the walls <br /> must be open to air,they can't be enclosed <br /> in the wall.Oatey makes a box,much like <br /> the washer box,for the air admittance <br /> valves. <br /> Please contact Sheltie with any questions <br /> you may have. Thank you. <br /> INSP12 CI SYSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.