Laserfiche WebLink
6/6/2022 Page <br /> City of Everett <br /> 8:14:32AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E2202-101 Site Address 4919 VIEW DR SE <br /> Applied 2/10/2022 Applicant CHEYENNE JOHNSTON Lot <br /> Approved 2/10/2022 Owner DAVIS DIANAM/DICKENSHEETS JAMES B Block <br /> Issued 2/11/2022 Contractor SOLGEN POWER(ELEC)LLC Tract <br /> Parent Permit No. B2202-025 Description 3 CIRCUITS FOR PV SOLAR ROOF MOUNT INSTALL <br /> Notes **MANUFACTURER SPEC SHOULD BE ONSITE FOR BUILDING INSPECTOR** <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 5/17/2022 5/17/2022 ELEC 05-SERVICE MCB NOT READY (4/28/2022 9:02 AM CRB) <br /> MAX-NEED INSPECTION 1-2PM <br /> MAX.FINELY@SOLGENPOWER.COM <br /> 5/26/2022 5/26/2022 ELEC 05-SERVICE MCB APPRVD-PERT eTRAKiT Inspection 5/17/2022 3:02 PM SOLGEN POWER <br /> Request (ELEC)LLC <br /> early PM inspect for SnoPUD reconnect <br /> Contact Name:Paul <br /> Site Address:4919 VIEW DR SE <br /> Phone:5092283743 <br /> e-Mail: <br /> paulyus.yusyavichyus@SOLGENPOWER. <br /> COM <br /> 6/1/2022 6/1/2022 ELEC 10-FINAL SKB APPRVD-PERK eTRAKiT Inspection 5/27/2022 12:16 PM SOLGEN POWER <br /> Request (ELEC)LLC <br /> customer is not available 9-930am <br /> Contact Name:Diana Davis <br /> Site Address:4919 VIEW DR SE <br /> Phone:3609411062 <br /> e-Mail: <br /> PERMITTING@SOLGENPOWER.COM <br /> (6/1/2022 3:16 PM SKB) <br /> PV system. <br /> INSP12 CASYSTEMS <br />