My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5818 WETMORE AVE 2022-06-29
>
Address Records
>
WETMORE AVE
>
5818
>
5818 WETMORE AVE 2022-06-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2022 11:37:30 AM
Creation date
6/29/2022 11:37:27 AM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
5818
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5/18/2022 Page 1 <br /> City of Everett <br /> 9:28:18AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E2204-022 Site Address 5818 WETMORE AVE <br /> Applied 4/4/2022 Applicant PHASE 3 ELECTRIC LLC Lot <br /> Approved 4/5/2022 Owner AGUILERA-SANTOS EMMANUEL&GARDNER Al Block <br /> Issued 4/5/2022 Contractor PHASE 3 ELECTRIC LLC Tract <br /> Parent Permit No. Description new 200 Amp Service on a detached building <br /> Notes Service and Panel only <br /> **SUBJECT TO FIELD INSPECTION,ADDITIONAL PERMITS MAY BE REQUIRED** <br /> Scheduled Completed Tyne Insuector Result Remarks Inspector's Comments <br /> 4/6/2022 4/6/2022 ELEC 05-SERVICE SKB PARTIAL APPR eTRAKiT Inspection 4/5/2022 11:18 AM PHASE 3 ELECTRIC <br /> Request LLC <br /> Need a final/service inspection <br /> Contact Name:PHASE 3 ELECTRIC LLC <br /> Site Address:5818 WETMORE AVE <br /> Phone:4255055596 <br /> e-Mail: <br /> RYANM@PHASE3ELECTRIC.COM <br /> (4/6/2022 3:24 PM SKB) <br /> skb changed Inspection Type from ELEC <br /> 09-FINAL to ELEC 05-SERVICE <br /> (4/6/2022 3:29 PM SKB) <br /> OK PUD.No branch or anything at this <br /> time to see corrections for next step. <br /> 4/6/2022 4/6/2022 ELEC 09-FINAL SKB CORRECTION (4/6/2022 3:29 PM SKB) <br /> For the service connect all grounding <br /> electrodes together to form one grounding <br /> electrode system.The feed from the house <br /> has to go away once the new service is <br /> energized.You can make the old feeder a <br /> sub panel off the new service if you would <br /> like. <br /> 5/17/2022 5/17/2022 ELEC 10-FINAL SKB APPRVD-PERK As noted. 5/16/2022 4:57 PM PHASE 3 ELECTRIC <br /> LLC <br /> Contact Name:PHASE 3 ELECTRIC LLC <br /> Site Address:5818 WETMORE AVE <br /> Phone:4253877091 <br /> e-Mail: <br /> RYANM@PHASE3ELECTRIC.COM <br /> (5/17/2022 3:52 PM SKB) <br /> Piping and conductors to two junction <br /> boxes for future equipment 2 locations for <br /> 60 amp with a conduit extending to a <br /> second location.one location for 50 amp <br /> and someone else will be completing the <br /> circuits.obtain electrical permit to complete <br /> circuit connections. <br /> INSP12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.