Laserfiche WebLink
5/18/2022 Page 1f /� <br /> City of Everett L <br /> 9:,6:52AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. P2101-005 Site Address 505 WOOD PL <br /> Applied 1/6/2021 Applicant WOLFE PLUMBING INC Lot <br /> Approved 1/7/2021 Owner OLYMPIC PARK LLC Block <br /> Issued 1/8/2021 Contractor WOLFE PLUMBING INC Tract <br /> Parent Permit No. Description replacing all underground waste and vent <br /> Notes same <br /> **SUBJECT TO FIELD INSPECTION** <br /> Scheduled Completed Tyne. Inspector Result Remarks Inspector's Comments <br /> 2/16/2021 2/16/2021 PLUMB SDP PARTIAL APPR eTRAKiT Inspection 2/12/2021 12:09 PM WOLFE PLUMBING <br /> 02-GROUND Request INC <br /> Contact Name:WOLFE PLUMBING INC <br /> Site Address:505 WOOD PL <br /> Phone:3607948621 <br /> e-Mail:jens@wolfepi.com <br /> (2/16/2021 10:49 AM SDP) <br /> Units;1101,1102,1103 ok groundwork. <br /> 2/16/2021 2/16/2021 PLUMB SDP PARTIAL APPR (2/16/2021 11:37 AM SDP) <br /> 03-ROUGH IN Units 1101,1102,1103 ok rough in. <br /> 2/23/2021 2/23/2021 PLUMB SDP PARTIAL APPR eTRAKiT Inspection 2/22/2021 11:09 AM WOLFE PLUMBING <br /> 02-GROUND Request INC <br /> Contact Name:WOLFE PLUMBING INC <br /> Site Address:505 WOOD PL <br /> Phone:3607948621 <br /> e-Mail:jens@wolfepi.com <br /> (2/23/2021 3:43 PM SDP) <br /> 1)Units 1105 and 1108 are complete <br /> 2)Unit 1107 except Kitchen <br /> 3)Note:there are two roof drain stacks <br /> connected to the sewer inside of the <br /> building.The contractor will run the roof <br /> drain line out of the building seperately and <br /> connect it back into the sewer outside of the <br /> building footprint.This will allow a repipe <br /> into the storm system at a later date. <br /> 3/2/2021 3/2/2021 PLUMB SDP PARTIALAPPR eTRAKiT Inspection 3/1/2021 10:38 AM WOLFE PLUMBING <br /> 02-GROUND Request INC <br /> Contact Name:WOLFE PLUMBING INC <br /> Site Address:505 WOOD PL <br /> Phone:3607948621 <br /> e-Mail:jens@wolfepi.com <br /> (3/2/2021 9:59 AM SDP) <br /> sdp changed Inspection Type from*NO <br /> INSPECTION CURRENTLY SELECTED* <br /> to PLUMB 02-GROUND WORK/SLAB <br /> (3/2/2021 10:42 AM SDP) <br /> Ok to cover waste and vents for units 1110 <br /> and 1112.Note;unit 1112 will still have the <br /> roof drain piping to install and inspect. <br /> 3/5/2021 3/5/2021 PLUMB SDP PARTIAL APPR (3/5/2021 3:48 PM SDP) <br /> 02-GROUND Units 1104,1106,1107,1109 and the <br /> laundry waste line and floor sink in the <br /> mechanical room on the 1st floor. <br /> INSP12 <br />