My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022/06/29 Council Agenda Packet
>
Council Agenda Packets
>
2022
>
2022/06/29 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2023 2:53:07 PM
Creation date
6/30/2022 8:16:55 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/29/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1- EVERETT <br />City Council Agenda Item Cover Sheet <br />Project title: An Ordinance creating a Special Improvement Project entitled "Water Pollution Control Facility <br />Combined Conveyance Improvements" Fund 336, Program 032. <br />Council Bill # <br />CB 2206-21 <br />Agenda dates requested: <br />June 22, 29 and July 6, 2022 <br />Briefing <br />Proposed action 6/22 and <br />6/29 <br />Consent <br />Action 7/6/22 <br />Ordinance X <br />Public hearing <br />Yes X No <br />Budget amendment: <br />Yes X No <br />PowerPoint presentation: <br />Yes X No <br />Attachments: <br />Proposed Ordinance <br />Department(s) involved: <br />Public Works, Admin <br />Contact person: <br />John Nottingham <br />Phone number: <br />(425) 257 8844 <br />Email: <br />iNottingham@everettwa.gov <br />Initialed by: <br />Department head <br />Administration <br />Council President <br />Consideration: Plans & Systems Ordinance <br />Project: WPCF Combined Conveyance Improvements <br />Partner/Supplier: <br />Location: Water Pollution Control Facility (WPCF) <br />Preceding action: None <br />Fund: 336-Water & Sewer System Improvements Fund <br />Fiscal summary statement: <br />The funding source for the design phase of this project will be Fund 401 Water and <br />Sewer Utility Fund. The programmed available funding for the design phase is 2,000,000. <br />Once the design phase is completed, the Public Works Department will bring a funding <br />ordinance for the construction phase to City Council for consideration. <br />Project summary statement: <br />This project encompasses improvements to the treatment process at the Water <br />Pollution Control Facility. Currently, peak flows (wet weather flows) that exceed the <br />plant headworks and the primary clarifier capacities are bypassed to the head of <br />Aerated Cell 1. These peak flows subsequently wash solids out of the aerated cells and <br />into the recirculation channel and the oxidation pond. The Combined Conveyance <br />Improvements Project will bypass the peak flows directly to the recirculation channel, <br />preventing solids washout from the aerated cells to the recirculation channel and the <br />oxidation pond. <br />Recommendation (exact action requested of Council): <br />Adopt an Ordinance creating a Special Improvement Project entitled "Water Pollution <br />Control Facility Combined Conveyance Improvements" Fund 336, Program 032. <br />
The URL can be used to link to this page
Your browser does not support the video tag.