My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022/06/29 Council Agenda Packet
>
Council Agenda Packets
>
2022
>
2022/06/29 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2023 2:53:07 PM
Creation date
6/30/2022 8:16:55 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/29/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett <br />2022 Biosolids Removal and Disposal <br />00 6363 - 2 <br />UT 3752-30 <br />Adjustment <br />to duration <br />by this Change <br />Order <br />90 days <br />New <br />Contract <br />Duration <br />(including <br />this <br />Change <br />Order) <br />165 <br />days <br />Change Order No. 1 <br />Change Order Effective Date <br />Contractor and City agree as follows: <br />1. The scope of Work shall be changed to the extent described in Exhibit A. <br />2. With the exception of Washington State sales tax, the amount of the change order <br />for the changes described in Exhibit A, represents complete compensation for the <br />changes described in Exhibit A, including all direct and indirect costs and impacts. <br />The contract price shall be adjusted as described in this Change Order. <br />3. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the <br />Mayor or his designee is authorized to direct Contractor to perform additional work. <br />In calculating such threshold amounts, Washington State sales tax, if applicable to <br />the Work, has been considered. <br />The duration of the Contract shall be adjusted to the extent described in this Change <br />Order. <br />Contractor waives and releases any and all claims arising out of, or related to, this <br />Change Order, the work described in Exhibit A, and all work and actual or <br />constructive changes that occurred or began prior to the date of this Change Order, <br />including, but not limited to, claims for equitable adjustment of time and <br />compensation, delay, impact, overhead, or inefficiencies. This provision does not <br />apply to requests for equitable adjustment of time or price for which the Contractor <br />timely and properly provided notice of a differing site condition, protest, dispute, <br />claim or Contract Claim as required by the Contract Documents. If the Contract <br />Documents establish a time period for notice of a differing site condition, protest, <br />dispute, claim, or Contract C aim that ends after the date of this Change Order, but <br />relates to work performed prior to the date of this Change Order, then this provision <br />does not apply if the Contractor timely and properly submits such notice <br />6. This Change Order only changes the contract between Contractor and City to the <br />extent explicitly provided herein. <br />Signature(s) on this Change Order may be by pdf, email, fax or other electronic <br />means, in which case such signature(s) will have the same effect as an original ink <br />signature. This Change Order may be signed in counterparts, each of which shall be <br />deemed an original, and all of which, taken together, shall be deemed one and the <br />same document. <br />00 6363 - 2 CHANGE ORDER - AGREED <br />
The URL can be used to link to this page
Your browser does not support the video tag.