Laserfiche WebLink
<br />Page 15 of 22 <br />12 2” x 4” quarry rock $ 60 $ <br />13 4’’ x 8’’ quarry rock $ 150 $ <br />14 8” x 18” half-man stone $ 60 $ <br />15 2-man rock $ 500 $ <br />16 4-man rock $ 500 $ <br />Subtotal Section B - Everett WPCF: $ <br /> <br />Section C - Picked up materials – On as needed basis. <br />Provide individual price per ton. <br /># Description – per Section 2 Specifications Price Per One Ton <br />17 ¾ minus crushed Top Course $ <br />18 1-1/4 minus crushed Base Course $ <br />19 2” clean shoulder ballast $ <br />20 2” x 4” quarry rock $ <br />21 4’’ x 8’’ quarry rock $ <br />22 8” x 18” half-man stone $ <br />23 2-man rock $ <br />24 4-man rock $ <br />25 2” drain rock $ <br />26 Pea gravel $ <br />Subtotal Section C - Picked Up Materials: $ <br /> <br />Section D – Delivery Site: Everett Water Filtration Plant, 6133 Lake Chaplain Road, Monroe <br />(8.5% WSST) <br /># Description – <br />Per Section 2 Specifications <br />Unit Price Estimated <br />Quantity <br />Extended Price