My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Redtail LLC 6/24/2022
>
Contracts
>
Capital Contract
>
Redtail LLC 6/24/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 10:48:54 AM
Creation date
7/8/2022 11:00:48 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Redtail LLC
Approval Date
6/24/2022
Council Approval Date
5/25/2022
Department
Public Works
Department Project Manager
Candice Au-Yeung
Subject / Project Title
Shore Avenue Force Main
Tracking Number
0003403
Total Compensation
$855,032.99
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Redtail LLC 4/27/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Redtail LLC 5/25/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
508
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 8-02.1 Description 181 <br /> 8-02.2 Materials 181 <br /> 8-02.3 Construction Requirements 181 <br /> 8-02.4 Measurement 182 <br /> 8-02.5 Payment 182 <br /> 8-04 CURBS, GUTTERS AND SPILLWAYS 183 <br /> 8-04.1 Description 183 <br /> 8-04.2 Materials 183 <br /> 8-04.3 Construction Requirements 183 <br /> 8-04.4 Measurement 183 <br /> 8-04.5 Payment 184 <br /> 8-05 PRIVATE IMPROVEMENTS(******) 184 <br /> 8-05.1 Description 184 <br /> 8-05.2 Materials 184 <br /> 8-05.3 Construction Requirements 184 <br /> 8-05.4 Measurement 184 <br /> 8-04.5 Payment 185 <br /> 8-06 CEMENT CONCRETE DRIVEWAY ENTRANCES 185 <br /> 8-06.1 Description 185 <br /> 8-06.2 Materials 185 <br /> 8-06.3 Construction Requirements 185 <br /> 8-06.4 Measurement 185 <br /> 8-06.5 Payment 185 <br /> 8-13 MONUMENT CASES 186 <br /> 8-13 SURVEY MONUMENTS AND CASES (******) 186 <br /> 8-13.4 Measurement 187 <br /> 8-13.5 Payment 187 <br /> DIVISION 9—MATERIALS 189 <br /> 9-04 JOINTS AND CRACK SEALING MATERIALS 189 <br /> 9-05 DRAINAGE STRUCTURES, CULVERTS,AND CONDUITS 189 <br /> 9-05.12 Polyvinyl Chloride (PVC) Pipe 189 <br /> 9-05.13 Ductile Iron Sewer Pipe 189 <br /> 9-05.15 Metal Castings 189 <br /> Shore Avenue Force Main Table of Contents- February 24, 2022 <br /> WO No.—UP3734 SP -viii <br />
The URL can be used to link to this page
Your browser does not support the video tag.