My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Redtail LLC 6/24/2022
>
Contracts
>
Capital Contract
>
Redtail LLC 6/24/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 10:48:54 AM
Creation date
7/8/2022 11:00:48 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Redtail LLC
Approval Date
6/24/2022
Council Approval Date
5/25/2022
Department
Public Works
Department Project Manager
Candice Au-Yeung
Subject / Project Title
Shore Avenue Force Main
Tracking Number
0003403
Total Compensation
$855,032.99
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Redtail LLC 4/27/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Redtail LLC 5/25/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
508
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Contractor shall also provide proof of insurance coverage in compliance with the <br /> statutory requirements of the Merchant Marine Act of 1920 (the "Jones Act"). <br /> 1-07.18(5)E Excess or Umbrella Liability <br /> The Contractor shall provide Excess or Umbrella Liability coverage at limits of <br /> $1,000,000 million per occurrence and annual aggregate. This excess or umbrella <br /> liability coverage shall apply, at a minimum, to both the Commercial General and <br /> Auto insurance policy coverage. <br /> This requirement may be satisfied instead through the Contractor's primary <br /> Commercial General and Automobile Liability coverage, or any combination thereof. <br /> 1-07.18(5)F Pollution Liability <br /> The Contractor shall provide a Pollution Liability policy, providing coverage for <br /> claims involving bodily injury, property damage (including loss of use of tangible <br /> property that has not been physically injured), cleanup costs, remediation, disposal <br /> or other handling of pollutants, including costs and expenses incurred in the <br /> investigation, defense, or settlement of claims arising out of: <br /> Contractor's operations related to this project; <br /> Remediation, abatement, repair, maintenance or other work with lead-based paint <br /> or materials containing asbestos; and <br /> Transportation of hazardous materials away from any site related to this project. <br /> Such Pollution Liability policy shall provide the following minimum coverage: <br /> $2,000,000 each loss and annual aggregate <br /> 1-07.18(5)G Professional Liability <br /> The Contractor, its Subcontractor and its design consultant providing construction <br /> management, value engineering, or other design-related non-construction <br /> professional services shall provide evidence of Professional Liability insurance <br /> covering professional errors and omissions. Such policy shall provide the following <br /> minimum limits: <br /> $2,000,000 per Claim <br /> If the scope of such design-related professional services includes work related to <br /> pollution conditions, the Professional Liability insurance shall include Pollution <br /> Liability coverage. <br /> If insurance is on a claims made form, its retroactive date, and that of all subsequent <br /> renewals, shall be no later than the effective date of this Contract. <br /> 1-07.18(5)H Builder's Risk <br /> If the Project includes construction of a structure, the Contractor shall procure and <br /> maintain during the life of the Contract, or until acceptance of the project by the City, <br /> whichever is longer, "All Risk" Builders Risk or Installation Floater Insurance at least <br /> as broad as ISO form number CP0020 (Builders Risk Coverage Form) with ISO <br /> form number CP0030 (Causes of Loss — Special Form) including coverage for <br /> collapse, theft, off-site storage and property in transit. The coverage shall insure for <br /> direct physical loss to property of the entire construction project, for 100% of the <br /> replacement value thereof and include earthquake. The policy shall be endorsed to <br /> cover the interests, as they may appear, of the City, Contractor and subcontractors <br /> of all tiers with the City and sub-contractors listed as a Named Insured. In the event <br /> of a loss to any or all of the work and/or materials therein and/or to be provided at <br /> any time prior to the final close-out of the Contract and acceptance of the project by <br /> the City, the Contractor shall promptly reconstruct, repair, replace or restore all work <br /> and/or materials so destroyed. Nothing herein provided for shall in any way excuse <br /> Shore Avenue Force Main Division 1 -GENERAL REQUIREMENTS February 24,2022 <br /> WO No-UP3734 SP-82 <br />
The URL can be used to link to this page
Your browser does not support the video tag.