Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> the Contractor or its surety from the obligation of furnishing all the required materials <br /> and completing the work in full compliance with the terms of the Contract. <br /> 1-07.20 Patented Devices, Materials, and Processes <br /> Delete the first paragraph of 1-07.20 and substitute the following: <br /> The Contractor shall assume all costs arising from the use of patented devices, <br /> materials, or processes used on or incorporated in the Work, and agrees to indemnify, <br /> defend, and save harmless the City, and its officers, employees and agents from all <br /> actions of any nature for, or on account of the use of any patented devices, materials, or <br /> processes. <br /> 1-07.23 Public Convenience and Safety <br /> Delete the last sentence of the first paragraph of 1-07.23 and substitute the following: <br /> Nothing contained in this Contract is intended to create any third-party beneficiary rights <br /> in favor of the public or any individual utilizing the facilities being constructed or improved <br /> under this Contract. <br /> 1-07.23(1) Construction Under Traffic <br /> Revise the third sentence of the second paragraph to read as follows: <br /> Do NOT impair accessibility to existing or temporary pedestrian push buttons. City <br /> may allow activating pedestrian recall timing or other accommodations during <br /> construction. <br /> Supplement 1-07.23(1) by adding the following: <br /> If Engineer determines the permitted closure hours adversely affect traffic, the <br /> Engineer may adjust the hours accordingly. The Engineer will notify the Contractor <br /> in writing of any change in the closure hours. <br /> No lane closures will be allowed on a holiday or holiday weekend, or after 12:00 <br /> p.m. on a day prior to a holiday or holiday weekend. A holiday weekend is defined <br /> as having a holiday fall on Friday, Saturday, Sunday or Monday. <br /> Contractor shall notify the local Fire, Police and Engineering Departments before <br /> the beginning of each phase of construction so that these agencies may re-route <br /> their emergency vehicles around the construction zone. The non-emergency phone <br /> number for Everett Police is 258-2484, for Fire Dispatch is 257-8757, and for Public <br /> Works Engineering is 257-8800. <br /> Contractor shall notify City of Everett Transit at 425-257-8984 and Community <br /> Transit at 425-348-7100 of all street closures or delays at least 24 hours in advance <br /> to enable rerouting of buses. <br /> Contractor shall notify the property owners at least 72 hours in advance to enable them <br /> to remove vehicles parked in the vicinity of Work. Towing vehicles shall be the <br /> responsibility of the Contractor and no additional payment will be made. <br /> Further supplement 1-07.23(1) by adding the following: <br /> 1-07.23(1)A General Requirements Traffic <br /> The following general requirements apply to all Work on the Project: <br /> Prepare and submit to Engineer a Traffic Control Plan in accordance with 1- <br /> 10.2(2)TRAFFIC CONTROL PLANS. <br /> Refer to 1-08.4(2) SPECIAL CONSTRUCTION CONSTRAINTS regarding <br /> construction constraints resulting from traffic control. <br /> Notify all affected property owners prior to commencing the barricading of <br /> streets, sidewalks and driveways. <br /> Shore Avenue Force Main Division 1 —GENERAL REQUIREMENTS February 24, 2022 <br /> WO No—UP3734 SP—83 <br />