My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Redtail LLC 6/24/2022
>
Contracts
>
Capital Contract
>
Redtail LLC 6/24/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 10:48:54 AM
Creation date
7/8/2022 11:00:48 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Redtail LLC
Approval Date
6/24/2022
Council Approval Date
5/25/2022
Department
Public Works
Department Project Manager
Candice Au-Yeung
Subject / Project Title
Shore Avenue Force Main
Tracking Number
0003403
Total Compensation
$855,032.99
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Redtail LLC 4/27/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Redtail LLC 5/25/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
508
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Note: Unit prices for all items,all extensions,and the total amount bid must be shown. Where conflict occurs between the unit price and <br /> the total amount named for any item,the unit price shall prevail,and totals shall be corrected to conform thereto. All entries must be <br /> typed or entered in init. <br /> BID SCHEDULE <br /> BIDDER: Redtail, LLC <br /> Item ITEM DESCRIPTION Unit Bid UNIT PRICE TOTAL AMOUNT <br /> No Qty <br /> 1 Mobilization LS 1 $ 76.000.00 $ 76.000,00 <br /> 2 SPCC Plan LS 1 $ 10,000.00 $ 10,000.00 <br /> 3 Baseline COVID-19 Requirements LS 1 $ 1,000.00 $ 1,000,00 <br /> 4 Surveying LS 1 $ 8,275.00 $ 8,275.00 <br /> 5 Traffic Control Labor HR 1,080 $__ 74.00 $ 79.920.00 <br /> Maintenance and Protection of Traffic <br /> 6 Control LS 1 $ 21,225.00 $ 21,225.00 <br /> 7 Trench Excavation Safety Systems LS 1 $ 7,500.00 $ 7 500.00 <br /> 8 Erosion/Water Pollution Control FA 1 $ 10,000,00 $ 10,000.00 <br /> 9 Street Cleaning &Sweeping HR 60 $ 200.00 $ 12,000.00 <br /> Sawcutting Asphalt Concrete Pavement, <br /> 10 Final Joint Cut up to 5-in LF 5,400 $ 4.70 $ 25 380.00 <br /> 11 HDPE Pipe for Force Main, 6-inch Diam. LF 2,530 $ 69.00 $ 174,570.00 <br /> Air Release/Vacuum Relief Valve <br /> 12 Assembly EA 1 $ 27.000.00 $ 27,000,00 <br /> 13 Drain Assembly EA 1 $ 14,000,00 $ 14,000.00 <br /> Discharge Assembly including DI Pipe <br /> 14 for Force Main, 6-inch Diam. EA 1 $ 34,000.00 $ 34,000.00 <br /> 15 Access Wye Assembly EA 3 $ 7.300.00 $ 21,900.00 <br /> 16 Crushed Surfacing Top Course TN 410 $ 37.00 $ 15.170.00 <br /> 17 Crushed Surfacing Base Course TN 1,400 $ 36.00_ $ 50 400.00 <br /> 18 Foundation Material, Class A or B TN 150 $ 35.00 $ 5,250,00 <br /> Shore Avenue Force Main Division P—PROPOSAL April 18, 2022 <br /> Work Order No.—UP3734 SP—5(Addendum 2) <br /> rovided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />
The URL can be used to link to this page
Your browser does not support the video tag.