Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> Note: Unit prices for all items,all extensions,and the total amount bid must be shown. Where conflict occurs between the unit price and <br /> the total amount named for any item,the unit price shall prevail,and totals shall be corrected to conform thereto. All entries must be <br /> typed or entered in init. <br /> BID SCHEDULE <br /> BIDDER: Redtail, LLC <br /> Item ITEM DESCRIPTION Unit Bid UNIT PRICE TOTAL AMOUNT <br /> No Qty <br /> 1 Mobilization LS 1 $ 76.000.00 $ 76.000,00 <br /> 2 SPCC Plan LS 1 $ 10,000.00 $ 10,000.00 <br /> 3 Baseline COVID-19 Requirements LS 1 $ 1,000.00 $ 1,000,00 <br /> 4 Surveying LS 1 $ 8,275.00 $ 8,275.00 <br /> 5 Traffic Control Labor HR 1,080 $__ 74.00 $ 79.920.00 <br /> Maintenance and Protection of Traffic <br /> 6 Control LS 1 $ 21,225.00 $ 21,225.00 <br /> 7 Trench Excavation Safety Systems LS 1 $ 7,500.00 $ 7 500.00 <br /> 8 Erosion/Water Pollution Control FA 1 $ 10,000,00 $ 10,000.00 <br /> 9 Street Cleaning &Sweeping HR 60 $ 200.00 $ 12,000.00 <br /> Sawcutting Asphalt Concrete Pavement, <br /> 10 Final Joint Cut up to 5-in LF 5,400 $ 4.70 $ 25 380.00 <br /> 11 HDPE Pipe for Force Main, 6-inch Diam. LF 2,530 $ 69.00 $ 174,570.00 <br /> Air Release/Vacuum Relief Valve <br /> 12 Assembly EA 1 $ 27.000.00 $ 27,000,00 <br /> 13 Drain Assembly EA 1 $ 14,000,00 $ 14,000.00 <br /> Discharge Assembly including DI Pipe <br /> 14 for Force Main, 6-inch Diam. EA 1 $ 34,000.00 $ 34,000.00 <br /> 15 Access Wye Assembly EA 3 $ 7.300.00 $ 21,900.00 <br /> 16 Crushed Surfacing Top Course TN 410 $ 37.00 $ 15.170.00 <br /> 17 Crushed Surfacing Base Course TN 1,400 $ 36.00_ $ 50 400.00 <br /> 18 Foundation Material, Class A or B TN 150 $ 35.00 $ 5,250,00 <br /> Shore Avenue Force Main Division P—PROPOSAL April 18, 2022 <br /> Work Order No.—UP3734 SP—5(Addendum 2) <br /> rovided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />