Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> SUBCONTRACTORS FORM <br /> 1. For heating, ventilation, air conditioning, plumbing(as defined by RCW Chap. 18.106) and electrical <br /> work (as defined by RCW Chap. 19.28), and structural steel installation and rebar installation, Bidder <br /> MUST either identify itself or Subcontractors in the chart below. If Bidder believes such work is not <br /> part of the scope of Work, Bidder shall write"NO WORK". <br /> 2. Bidder shall not list more than one Subcontractor for each category of work identified, unless <br /> Subcontractors vary with bid alternates, in which case the Bidder must indicate which Subcontractor <br /> will be used for which alternate. <br /> 3. Bidder's bid shall be deemed nonresponsive and void if: <br /> A. For heating, ventilation, air conditioning, plumbing, electrical, structural steel installation and <br /> rebar installation,Bidder fails(1)to submit as part of the Bid the names of such Subcontractors, <br /> (2) to name itself to perform such Work,or(3)to write"No Work"; or <br /> B. Bidder names two or more Subcontractors to perform the same work. <br /> 4. The requirement to name the Bidder's proposed heating, ventilation and air conditioning, plumbing, <br /> electrical, structural steel installation and rebar installation subcontractors applies only to proposed <br /> heating, ventilation and air conditioning, plumbing, electrical, structural steel installation and rebar <br /> installation subcontractors who will contract directly with the general contractor submitting the Bid to <br /> the City. <br /> 5. The heating,ventilation and air conditioning,plumbing, electrical portions of the chart below must be <br /> submitted with the bid proposal or within one hour of the published bid submittal time. <br /> 6. The structural steel installation and rebar installation portions of the chart below must be submitted <br /> with the bid proposal or within forty-eight hours of the published bid submittal time. <br /> Type/Scope of Work Name and Address of Subcontractor/Or Bidder <br /> HEATING <br /> Subcontractor, bidder or"no work" MUST be No Work <br /> stated <br /> VENTILATION AND AIR CONDITIONING <br /> Subcontractor,bidder or"no work"MUST be No Work <br /> stated <br /> PLUMBING(as described in RCW Chap. 18.106) <br /> Subcontractor, bidder or"no work"MUST be No Work <br /> stated <br /> ELECTRICAL (as described in RCW Chap. <br /> 19.28) <br /> Subcontractor, bidder or "no work" MUST be No Work <br /> stated <br /> STRUCTURAL STEEL INSTALLATION <br /> Subcontractor, bidder or"no work" MUST be No Work <br /> stated <br /> REBAR INSTALLATION <br /> Subcontractor,bidder or"no work" MUST be No Work <br /> stated <br /> Shore Avenue Force Main Division P-PROPOSAL February 24,2022 <br /> Work Order No.-tJP3734 SP-8 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Seal <br />