My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Redtail LLC 6/24/2022
>
Contracts
>
Capital Contract
>
Redtail LLC 6/24/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 10:48:54 AM
Creation date
7/8/2022 11:00:48 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Redtail LLC
Approval Date
6/24/2022
Council Approval Date
5/25/2022
Department
Public Works
Department Project Manager
Candice Au-Yeung
Subject / Project Title
Shore Avenue Force Main
Tracking Number
0003403
Total Compensation
$855,032.99
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Redtail LLC 4/27/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Redtail LLC 5/25/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
508
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-02.14 Disqualification of Bidders 43 <br /> 1-02.15 Pre-Award Information 44 <br /> 1-03 AWARD AND EXECUTION OF CONTRACT 44 <br /> 1-03.1 Consideration of Bids 44 <br /> 1-03.2 Award of Contract 45 <br /> 1-03.3 Execution of Contract 45 <br /> 1-03.4 Contract Bond 45 <br /> 1-03.5 Failure to Execute Contract 46 <br /> 1-03.6 Return of Bid Deposit 46 <br /> 1-03.7 Judicial Review 46 <br /> 1-04 SCOPE OF THE WORK 46 <br /> 1-04.1 Intent of the Contract 46 <br /> 1-04.2 Coordination of Contract Documents, Plans, Special Provisions Specifications, and <br /> Addenda 47 <br /> 1-04.3 Reference Information 48 <br /> 1-04.4 Changes 48 <br /> 1-04.5 Procedure and Protest by the Contractor 50 <br /> 1-04.5(2) Form of Notice 51 <br /> 1-04.6 Variation in Estimated Quantities 51 <br /> 1-04.7 Differing Site Conditions(Changed Conditions) 52 <br /> 1-05 CONTROL OF WORK 52 <br /> 1-05.1 Authority of the Engineer 52 <br /> 1-05.2 Authority of Assistants and Inspectors 53 <br /> 1-05.3 Working Drawings 54 <br /> 1-05.4 Conformity With and Deviations From Plans and Stakes 56 <br /> 1-05.6 Inspection of Work and Materials 58 <br /> 1-05.7 Removal of Defective and Unauthorized Work 59 <br /> 1-05.10 Guarantees 59 <br /> 1-05.11 Final Inspection 60 <br /> 1-05.12 Final Acceptance 61 <br /> 1-05.13 Superintendents, Labor and Equipment of Contractor 62 <br /> 1-05.14 Cooperation With Other Contractors 62 <br /> 1-05.16 Water and Power (******) 63 <br /> Shore Avenue Force Main Table of Contents- February 24, 2022 <br /> WO No.—UP3734 SP- ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.