My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Redtail LLC 6/24/2022
>
Contracts
>
Capital Contract
>
Redtail LLC 6/24/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 10:48:54 AM
Creation date
7/8/2022 11:00:48 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Redtail LLC
Approval Date
6/24/2022
Council Approval Date
5/25/2022
Department
Public Works
Department Project Manager
Candice Au-Yeung
Subject / Project Title
Shore Avenue Force Main
Tracking Number
0003403
Total Compensation
$855,032.99
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Redtail LLC 4/27/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Redtail LLC 5/25/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
508
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-01 DEFINITIONS AND TERMS <br /> 1-01.3 Definitions <br /> Delete the three paragraphs under the heading Completion Dates, and substitute the <br /> following: <br /> Substantial Completion Date: The day the Engineer determines the City has full and <br /> unrestricted use and benefit of the facilities, both from the operational and safety standpoint, <br /> any remaining traffic disruptions will be rare and brief, and only minor incidental work, <br /> replacement of temporary substitute facilities, plant establishment periods, or correction or <br /> repair remains for the Physical Completion of the total Contract. <br /> Physical Completion Date: The day all of the Work is physically completed on the project. <br /> All documentation required by the Contract and required by law does not necessarily need <br /> to be furnished by the Contractor by this date. <br /> Completion Date: Date on which Project is ready for Final Acceptance. All physical work, <br /> including Punch List, is complete and Contractor has completed and fulfilled all contractual <br /> obligations except any maintenance of landscaping. Contractual obligations that must be <br /> fulfilled prior to achievement of the Completion Date include, and are not limited to; the <br /> Contractor's furnishing all documentation, including correct, complete and accurate as-built <br /> or record drawings and operation and maintenance manuals and transfer of warranties. <br /> (This definition replaces the definition in WSDOT 1-01.3 for Completion Dates.) <br /> Revise the following definitions to read as follows: <br /> Award: The decision by Everett City Council to award a contract and authorize the Mayor <br /> to sign the Contract. No contract is formed until the Mayor signs the contract. (This definition <br /> replaces the definition in WSDOT 1-01.3 for Bid Documents.) <br /> Bid Documents: The component parts of the proposed Contract which may include, but are <br /> not limited to, the Proposal Form, the proposed Contract Provisions, the proposed Contract <br /> Plans, and Addenda. (This definition replaces the definition in WSDOT 1-01.3 for Bid <br /> Documents.) <br /> Contract: Written agreement signed between the City and Contractor and includes Division <br /> C—CONTRACT, Division P- PROPOSAL, Division B— BID ITEM DESCRIPTIONS, Special <br /> Provisions, Contract Plans, Standard Specifications and amendments, Standard Plans in <br /> effect as of the date Bids are opened, Addenda, supplemental agreements, change orders, <br /> certifications and affidavits required by this Contract and by law, and Federal requirements <br /> that apply to this Contract and Project. (This definition replaces the definition in WSDOT 1- <br /> 01.3 for Contract.) <br /> Contract Bond(s): Include a separate performance bond and payment bond, as set forth in <br /> the Contract Documents. (This definition supplements the definition in WSDOT 1-01.3 for <br /> Contract Bond.) <br /> Engineer: The City's representative who administers the construction program for the City. <br /> Provisions in the Contract Documents that state the Engineer"shall"or"will" shall be deemed <br /> to mean that the Engineer shall or will take such action if requested in writing by the <br /> Contractor. (This definition replaces the definition in WSDOT 1-01.3 for Engineer.) <br /> Specifications: Includes 2021 WSDOT/APWA Standard Specifications and latest <br /> Amendments, and all other specifications (including these Special Provisions) for the <br /> prescribed Work in this Contract. (This definition replaces the definition in WSDOT 1-01.3 <br /> for Specifications.) <br /> Working Drawings: Drawings, shop drawings, plans, diagrams, or calculations, including a <br /> schedule of submittal dates for Working Drawings where specified, which the Contractor must <br /> submit to the Engineer. (This definition replaces the definition in WSDOT 1-01.3 for Working <br /> Drawings.) <br /> Supplement Section 1-01.3 by adding the following: <br /> Shore Avenue Force Main Division 1 —GENERAL REQUIREMENTS February 24,2022 <br /> WO No—UP3734 SP—34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.