Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> All references in the Standard Specifications to the terms "State", "Department of <br /> Transportation", "Washington State Transportation Commission", "Commission", "Secretary <br /> of Transportation", "Secretary", "Headquarters", and "State Treasurer" shall be revised to <br /> read "City." <br /> All references to the terms "State" or "state" shall be revised to read "City" unless the <br /> reference is to an administrative agency of the State of Washington, a State statute or <br /> regulation, or the context reasonably indicates otherwise. <br /> All references to "State Materials Laboratory" shall be revised to read "City designated <br /> location." <br /> All references to "final contract voucher certification" shall be interpreted to mean the City <br /> form(s) by which final payment is authorized, and final completion and acceptance granted. <br /> Additive: A supplemental unit of work or group of bid items, identified separately in the <br /> Proposal, that may, at the discretion of the City, be awarded in addition to the base Bid. <br /> Alternative or Alternate: One of two or more units of Work or groups of bid items, identified <br /> separately in the Proposal, from which the City may make a choice between different <br /> methods or material of construction for performing the same Work. <br /> Award Date: The date of the formal action by the Everett City Council to accept the lowest <br /> responsible and responsive Bidder for the Work. <br /> Baseline COVID-19 Requirements: Baseline COVID-19 Requirements include all COVID- <br /> 19 Requirements applicable to the Work as of the date of Bid opening. <br /> Bid Opening Date: The date the Everett City Clerk publicly opens and reads the Bids. <br /> Business Day: A business day is any day from Monday through Friday except holidays as <br /> listed in 1-08.5. <br /> Change Order: Reference to Change Order shall include all rights of the City and Contractor <br /> under 1-04.4 CHANGES. Agreed Change Orders shall be in the form attached as Appendix <br /> C. Unilateral Change Orders shall be in the form attached as Appendix C. <br /> City: The City of Everett, Washington. "City" and "Owner" and "Contracting Agency" mean <br /> the same. <br /> City's Representative: The person designated in writing by the City to act as its <br /> representative at the construction site and to perform construction inspection service and <br /> administrative functions relating to this Contract. The terms "Engineer", "Architect", or <br /> "Owner's Representative" shall be interchangeable with City's Representative. <br /> Contract Claim: Any request by the Contractor for additional time or money resulting in <br /> adjustment of Contract Sum or Contract Time irrespective of the cause or reason for the <br /> request. Contract Claims include, but are not limited to, requests by the Contractor for <br /> additional time or money due to Extra Work, inefficiencies, Delays, interferences, and <br /> problems with the design. Contract Claim includes, but is not limited to, claims or requests <br /> by Subcontractors for extensions of Contract Time, adjustment of Contract Sum, additional <br /> compensation that the Contractor attempts to pass through or assert against the City, or <br /> claims against the City arising out of a third party's claim against the Contractor. <br /> Contract Documents: All of the items that together make up the complete Contract. See <br /> definition for "Contract." <br /> Contract Execution Date: The date the Mayor of the City of Everett signs the Contract or <br /> the date that the Contractor signs the Contract, whichever date is later. This officially binds <br /> the Contractor to the Contract. <br /> Contract Sum: The price in dollars stated in the Contract to be paid by the City to the <br /> Contractor for the Work described in the Contract Documents, as modified by Change <br /> Orders. <br /> Contract Time: The period of time established by the terms and conditions of the Contract <br /> within which the Work must be physically completed. <br /> Shore Avenue Force Main Division 1 -GENERAL REQUIREMENTS February 24, 2022 <br /> WO No-UP3734 SP-35 <br />