Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> Contract Documents. These bonds shall serve as security for the faithful performance <br /> of the Work and as security for the faithful payment and satisfaction of the persons <br /> furnishing materials and performing labor on the Work. The bonds shall be issued by a <br /> corporation duly and legally licensed to transact surety business in the State of <br /> Washington. Such bonds shall remain in force throughout the period required to <br /> complete the Work, and thereafter for a period of 365 calendar days after Final <br /> Acceptance. The bonds must be executed by a duly licensed surety company, which is <br /> listed in the latest Circular 570 of the United States Treasury Department, as being <br /> acceptable as surety on federal bonds. No surety's liability on the bond shall exceed <br /> the underwriting limitations for the respective surety specified in Circular 570. The bonds <br /> must be signed by an officer of the Contractor empowered to sign binding instruments. <br /> The bonds must be accompanied by a fully executed and original power of attorney for <br /> the officer executing on behalf of the surety. The scope of the bonds or the form thereof <br /> prescribed in these Contract Documents shall in no way affect or alter the liabilities of <br /> the Contractor to the City as set forth in the Contract Documents. <br /> 1-03.5 Failure to Execute Contract <br /> Supplement 1-03.5 by adding the following: <br /> In addition to the items listed in the first paragraph of 1-03.5, failure to have or obtain a <br /> City of Everett business license prior to executing the Contract, unless immediately <br /> cured by Bidder after notice from the City, shall result in forfeiture of the proposal bond <br /> or deposit of this Bidder. <br /> 1-03.6 Return of Bid Deposit <br /> Supplement 1-03.6 by adding the following: <br /> Within 15 calendar days after the Bids are opened, the City will return the bid deposit <br /> accompanying the Bids that are not to be considered in making the Award. <br /> 1-03.7 Judicial Review <br /> Revise 1-03.7 to read as follows: <br /> All protests by Bidders must be in accordance with Chapter 3.46 of the Everett Municipal <br /> Code, "Bid Protest Procedures." <br /> The exclusive venue of all lawsuits shall be in Snohomish County Superior Court. <br /> 1-04 SCOPE OF THE WORK <br /> 1-04.1 Intent of the Contract <br /> Supplement 1-04.1 by adding the following: <br /> 1-04.1(3) Specifications and Plans <br /> (******) <br /> 1-04.1(3)A Interpretation of Specifications and Plans <br /> The Specifications and Plans are intended to be explanatory and supportive of each <br /> other. Work specified on the Plans and not in the Specifications, or vice versa, shall <br /> be executed as if specified in both. In the event the Work to be done or matters <br /> relative thereto are not sufficiently detailed or explained in the Contract Documents, <br /> the Contractor shall immediately ask the City's Representative for further <br /> explanation and shall comply with such explanation. In the event of doubt or <br /> question arising respecting the true meaning of the Specifications or Plans, <br /> Contractor shall refer to the City's Representative for its decision. <br /> Shore Avenue Force Main Division 1 —GENERAL REQUIREMENTS February 24,2022 <br /> WO No—UP3734 SP—46 <br />