Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> Specifications, Standard Plans in effect as of the date Bids are opened, Addenda, <br /> supplemental agreements, change orders, certifications and affidavits required by this <br /> Contract and by law, and Federal requirements that apply to this Contract and Project. <br /> These parts complement each other in describing a complete Work.Any requirement in <br /> one part binds as if stated in all parts. The Contractor shall provide any Work or materials <br /> clearly implied in the Contract even if the Contract does not mention it specifically. <br /> Any inconsistency in the parts of the Contract shall be resolved by following this order <br /> of precedence: <br /> 1. Change Orders, <br /> 2. Addenda, <br /> 3. Division C— CONTRACT, <br /> 4. Division P - PROPOSAL, <br /> 5. Division B — BID ITEM DESCRIPTIONS <br /> 6. Special Provisions, <br /> 7. Contract Plans, <br /> 8. City's Standard Drawings (if any) <br /> 9. WSDOT/APWA Standard Specifications for Road, Bridge, and Municipal <br /> Construction, <br /> 10.WSDOT/APWA Standard Plans for Road, Bridge and Municipal Construction. <br /> Revise the seventh paragraph of 1.04.2 to read as follows: <br /> In case of any ambiguity or dispute over interpreting the Contract, the Engineer's <br /> decision will be final as provided in 1-05.1 AUTHORITY OF THE ENGINEER. <br /> 1-04.3 Reference Information <br /> Revise 1-04.3 to read as follows: <br /> Reference Information provided to the Contractor is not part of the Contract. The City of <br /> Everett does not guarantee the accuracy of the Reference Information and is not <br /> responsible for the content of the Reference Information in any manner. Any use of <br /> Reference Information by the Contractor is done solely at the Contractor's risk. <br /> 1-04.4 Changes <br /> Delete 1-04.4 and substitute the following: <br /> 1-04.4 Changes <br /> 1-04.4(1) City's Right to Direct Changes to the Work <br /> (******) <br /> The City reserves the right to change the Work at any time. Such changes shall not <br /> invalidate the Contract nor release the Surety, and the Contractor agrees to perform the <br /> Work as changed. Among others, these changes and alterations may include: <br /> 1. Deleting or omitting any part of the Work, Equipment or material to be <br /> provided under this Contract, <br /> 2. Increasing or decreasing quantities, <br /> 3. Altering Specifications, designs, or both, <br /> 4. Altering the way the Work is to be done, <br /> 5. Adding new Work or Extra Work, <br /> 6. Altering facilities, Equipment, materials, services, or sites, provided by the <br /> City, and <br /> Shore Avenue Force Main Division 1 -GENERAL REQUIREMENTS February 24, 2022 <br /> WO No-UP3734 SP-48 <br />