CITY OF EVERETT SPECIAL PROVISIONS <br /> The City's Representative has the authority to recommend Change Orders, but does not <br /> have authority to approve Change Orders. Proposed Change Orders are subject to review <br /> and approval by the City. No proposed Change Order or any change of Contract Sum or <br /> Contract Time is effective or binding upon the City unless and until the Mayor or its designee <br /> signs it, as authorized by City Council or by ordinance. <br /> To detail and illustrate the Work, the City's Representative may furnish to the Contractor <br /> additional drawings and explanations consistent with the original Plans. The Contractor shall <br /> perform the Work according to these additional drawings and explanations. <br /> The City's Representative may appoint assistants and inspectors to assist in determining that <br /> the Work and materials meet the Contract requirements. Assistants and inspectors have the <br /> authority to reject defective material and suspend Work that is being done improperly, subject <br /> to the final decisions of the City's Representative or, when appropriate, the City. <br /> Assistants and inspectors are not authorized to accept Work, to accept materials, to issue <br /> instructions, or to give advice that is contrary to the Contract. Work done or material furnished <br /> that does not meet the Contract requirements shall be at the Contractor's risk and shall not <br /> be a basis for a Contract Claim even if the inspectors or assistants purport to change the <br /> Contract. <br /> Assistants and inspectors may advise the Contractor of any faulty work or materials or <br /> infringements of the terms of the Contract; however, failure of the City's Representative or <br /> the assistants or inspectors to advise the Contractor does not constitute acceptance or <br /> approval. <br /> 1-05.3 Working Drawings <br /> Revise the second paragraph to read as follows: <br /> 1. Type 1 — Submitted for City information. Submittal must be received by the City a <br /> minimum of 7 working days before Work represented by the submittal begins. <br /> 2. Type 2 — Submitted for City review and comment. Unless otherwise stated in the <br /> Contract, the Engineer will require up to 15 working days from the date the Working <br /> Drawing is received until it is returned to the Contractor. The Contractor shall not proceed <br /> with the Work represented by the Working Drawing until comments from the Engineer <br /> have been addressed. <br /> 3. Type 2E —Same as a Type 2 Working Drawing with Engineering as described below. <br /> 4. Type 3 — Submitted for City review and approval. Unless otherwise stated in the <br /> Contract, the Engineer will require up to 20 working days from the date the Working <br /> Drawing is received until it is returned to the Contractor. The Contractor shall obtain the <br /> Engineer's written approval before proceeding with the Work represented by the <br /> Working Drawing. <br /> 5. Type 3E— Same as a Type 3 Working Drawing with Engineering as described below. <br /> Supplement 1-05.3 as follows: <br /> The Contract Documents include Plans that show such details as are reasonably <br /> necessary to give a comprehensive understanding of the Work. The Contractor shall <br /> submit alterations affecting the requirements and information in the Plans in writing to <br /> the Engineer for approval prior to performing such Work. <br /> The Engineer may supplement the Plans with additional drawings and explanations, <br /> consistent with the purpose and intent of the original Plans, to detail and illustrate the <br /> Work. The Contractor shall perform the Work according to these supplemental drawings <br /> and explanations. <br /> In addition to supplemental drawings furnished by the Engineer,the Contract Documents <br /> may also be supplemented by Type 1, Type 2 or 2E, and Type 3 or 3E Working Drawings <br /> Shore Avenue Force Main Division 1 —GENERAL REQUIREMENTS February 24,2022 <br /> WO No—UP3734 SP—54 <br />