My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Redtail LLC 6/24/2022
>
Contracts
>
Capital Contract
>
Redtail LLC 6/24/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 10:48:54 AM
Creation date
7/8/2022 11:00:48 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Redtail LLC
Approval Date
6/24/2022
Council Approval Date
5/25/2022
Department
Public Works
Department Project Manager
Candice Au-Yeung
Subject / Project Title
Shore Avenue Force Main
Tracking Number
0003403
Total Compensation
$855,032.99
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Redtail LLC 4/27/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Redtail LLC 5/25/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
508
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> prepared by the Contractor, material supplier, or manufacturer, when necessary or as <br /> required by the Contract Documents to detail and illustrate portions of the Work. All <br /> types of Working Drawings shall be reviewed by the Engineer before work pursuant to <br /> those Working Drawings is performed. Type 3 and 3E Working Drawings may include, <br /> and not be limited to, shop details, erection plans, masonry lay-out diagrams, reinforcing <br /> steel and bending diagrams, post tensioning plans, shoring, cribbing, cofferdam, or <br /> falsework plans, formwork plans, or hydraulic items. Type 2 and 2E Working Drawings <br /> may include, and not be limited to, Catalog cuts or standard plans for commonly used <br /> manufactured items. <br /> The Contractor shall be fully responsible for the accuracy of dimensions and details on <br /> Working Drawings, and for complete conformity with the Contract Documents, even if <br /> the Working Drawings have been approved by the Engineer, or if the Contractor and the <br /> Engineer agree on dimensions and details. The City does not accept Working Drawings <br /> as accurate or adequate, and does not take responsibility for, or warrant that Working <br /> Drawings will meet Contract requirements. <br /> Engineer's review of Working Drawings shall not relieve Contractor from responsibility <br /> for variation from the requirements of the Contract Documents unless Contractor has in <br /> writing called the Engineer's attention to each such variation at the time of submission, <br /> and the Engineer has given written approval of each such variation by a specific written <br /> notation thereof incorporated in or accompanying the returned Working Drawing; nor will <br /> review by Engineer relieve Contractor from responsibility for errors or omissions in the <br /> Working Drawings or from responsibility for having complied with the provisions of this <br /> section. <br /> The Bid prices shall include all costs for furnishing Working Drawings and Submittals. <br /> The following listed sections of the Standard Specifications and Special Provisions <br /> require Working Drawings that may or may not be applicable to this specific project. This <br /> list is supplied as an aid to the Contractor and is by no means complete. Submittal <br /> requirements may be found in 1-05.3(1) or elsewhere in these Special Provisions. <br /> DIVISION 2 EARTHWORK <br /> 2-09.3(3)D Shoring, Cribbing, and Cofferdams-Shop Drawings <br /> DIVISION 7 DRAINAGE STRUCTURES, STORM SEWERS, SANITARY <br /> SEWERS, WATER MAINS, AND CONDUITS <br /> 7-05 MANHOLES, INLETS, CATCH BASINS AND DRYWELLS <br /> 7-05.2 Materials-Catalog Cuts or Standard Plans <br /> 7-08 GENERAL PIPE INSTALLATION REQUIREMENTS <br /> 7-08.2 Materials-Catalog Cuts or Standard Plans <br /> 7-16 SEWER FORCE MAIN ACCESS WYE ASSEMBLIES <br /> 7-16.2 Materials-Catalog Cuts or Standard Plans <br /> 7-17 SANITARY SEWERS <br /> 7-17.2 Materials-Catalog Cuts or Standard Plans <br /> 7-18 SIDE SEWERS <br /> 7-18.2 Materials-Catalog Cuts or Standard Plans <br /> 7-20 SANITARY SEWER FORCE MAINS <br /> 7-20.2 Materials-Catalog Cuts or Standard Plans <br /> DIVISION 8 MISCELLANEOUS CONSTRUCTION <br /> 8-13 Monument Cases <br /> Shore Avenue Force Main Division 1 -GENERAL REQUIREMENTS February 24, 2022 <br /> WO No-UP3734 SP-55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.