Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> 2-11.5 Payment 137 <br /> DIVISION 4-BASES 139 <br /> 4-04 BALLAST AND CRUSHED SURFACING 139 <br /> 4-04.1 Description 139 <br /> 4-04.3 Construction Requirements 139 <br /> 4-04.4 Measurement 139 <br /> 4-04.5 Payment 139 <br /> 4-06 ASPHALT TREATED BASE (ATB) 139 <br /> 4-06.1 Description 139 <br /> 4-06.2 Materials 140 <br /> 4-06.3 Construction Requirements 140 <br /> 4-06.4 Measurement 142 <br /> 4-06.5 Payment 142 <br /> DIVISION 5—SURFACE TREATMENTS AND PAVEMENTS 143 <br /> 5-04 HOT MIX ASPHALT 143 <br /> 5-04.1 Description 143 <br /> 5-04.2 Materials 143 <br /> 5-04.3 Construction Requirements 145 <br /> 5-04.4 Measurement 164 <br /> 5-04.5 Payment 164 <br /> 5-06 PAVEMENT PATCHING (******) 164 <br /> 5-06.1 Description 164 <br /> 5-06.2 Materials 164 <br /> 5-06.3 Construction Requirements 164 <br /> 5-06.4 Measurement 166 <br /> 5-06.5 Payment 166 <br /> DIVISION 7—DRAINAGE STRUCTURES,STORM SEWERS,SANITARY SEWERS,WATER MAINS,AND <br /> CONDUITS 167 <br /> 7-05 MANHOLES, INLETS,AND CATCH BASINS 167 <br /> 7-05.1 Description 167 <br /> 7-05.2 Materials 167 <br /> 7-05.3 Construction Requirements 167 <br /> 7-05.4 Measurement 169 <br /> Shore Avenue Force Main Table of Contents- February 24, 2022 <br /> WO No.— UP3734 SP-vi <br />