My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Redtail LLC 6/24/2022
>
Contracts
>
Capital Contract
>
Redtail LLC 6/24/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 10:48:54 AM
Creation date
7/8/2022 11:00:48 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Redtail LLC
Approval Date
6/24/2022
Council Approval Date
5/25/2022
Department
Public Works
Department Project Manager
Candice Au-Yeung
Subject / Project Title
Shore Avenue Force Main
Tracking Number
0003403
Total Compensation
$855,032.99
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Redtail LLC 4/27/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Redtail LLC 5/25/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
508
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> final inspection. The Engineer will set a date for final inspection. The Engineer and the <br /> Contractor will then make a final inspection and the Engineer will notify the Contractor <br /> in writing of all particulars in which the final inspection reveals the Work incomplete or <br /> unacceptable. The Contractor shall immediately take such corrective measures as are <br /> necessary to remedy the listed deficiencies. Corrective work shall be pursued vigorously, <br /> diligently, and without interruption until physical completion of the listed deficiencies.This <br /> process will continue until the Engineer is satisfied the listed deficiencies have been <br /> corrected. <br /> If action to correct the listed deficiencies is not initiated within seven days after receipt <br /> of the written notice listing the deficiencies, the Engineer may, upon written notice to the <br /> Contractor, take whatever steps are necessary to correct those deficiencies pursuant to <br /> 1-05.7 REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK. <br /> The Contractor will not be allowed an extension of Contract Time because of a Delay in <br /> the performance of the Work attributable to the exercise of the Engineer's right under <br /> the authority of the Contract. <br /> Upon correction of all deficiencies, the Engineer will notify the Contractor and the City, <br /> in writing, of the date upon which the Work was considered physically complete. That <br /> date shall constitute the Physical Completion Date of the Contract, but shall not imply <br /> acceptance of the Work or that all the obligations of the Contractor under the Contract <br /> have been fulfilled. <br /> 1-05.11(3) Operational Testing <br /> It is the intent of the City to have at the Physical Completion Date a complete and <br /> operable system. Therefore when the Work involves the installation of machinery or <br /> other mechanical equipment; street lighting, electrical distribution or signal systems; <br /> irrigation systems; buildings; or other similar work it may be desirable for the Engineer <br /> to have the Contractor operate and test the Work for a period of time after final inspection <br /> but prior to the Physical Completion Date. Whenever items of Work are listed in the <br /> Contract Documents for operational testing they shall be fully tested under operating <br /> conditions for the time period specified to ensure their acceptability prior to the Physical <br /> Completion Date. During and following the test period, the Contractor shall correct any <br /> items of workmanship, materials, or Equipment that prove faulty, or that are not in first <br /> class operating condition. Equipment, electrical controls, meters, or other devices and <br /> Equipment to be tested during this period shall be tested under the observation of the <br /> Engineer, so that the Engineer may determine their suitability for the purpose for which <br /> they were installed. The Physical Completion Date cannot be established until testing <br /> and corrections have been completed to the satisfaction of the Engineer. <br /> The costs for power, gas, labor, material, supplies, and everything else needed to <br /> successfully complete operational testing, shall be included in the unit contract prices <br /> related to the system being tested, unless specifically set forth otherwise in the Proposal. <br /> Operational and test periods, when required by the Engineer, shall not affect a <br /> manufacturer's guaranties or warranties furnished under the terms of the Contract. <br /> 1-05.12 Final Acceptance <br /> Delete all of 1-05.12 and substitute the following: <br /> The Contractor shall perform all the obligations under the Contract before the completion <br /> date can be established. A certificate of completion of the Work issued by the City will <br /> establish the completion date and certify the Work as complete. The following shall <br /> occur before the completion date can be established: <br /> The Final Contract Voucher Certification shall be signed by the Contractor verifying <br /> agreement to the final contract price. <br /> Shore Avenue Force Main Division 1 —GENERAL REQUIREMENTS February 24, 2022 <br /> WO No—UP3734 SP—61 <br />
The URL can be used to link to this page
Your browser does not support the video tag.