My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Redtail LLC 6/24/2022
>
Contracts
>
Capital Contract
>
Redtail LLC 6/24/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 10:48:54 AM
Creation date
7/8/2022 11:00:48 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Redtail LLC
Approval Date
6/24/2022
Council Approval Date
5/25/2022
Department
Public Works
Department Project Manager
Candice Au-Yeung
Subject / Project Title
Shore Avenue Force Main
Tracking Number
0003403
Total Compensation
$855,032.99
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Redtail LLC 4/27/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Redtail LLC 5/25/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
508
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> The physical work on the Project shall be complete. <br /> The Contractor shall furnish all documentation required by the Contract and <br /> required by law, necessary to allow the City to certify the Contract as complete. <br /> A certificate of completion for the Work, signed by the City, will constitute acceptance of <br /> the Work. The issuance of this certificate of completion will not constitute acceptance of <br /> unauthorized or defective Work, Equipment, or materials. <br /> The Contractor agrees that neither completion nor final acceptance shall relieve the <br /> Contractor of the responsibility to indemnify, defend, and protect the City against any <br /> claim or loss resulting from the failure of the Contractor, or the Subcontractors or lower <br /> tier subcontractors, to pay all laborers, mechanics, Subcontractors, material persons, or <br /> any other person who provides labor, supplies, or provisions for carrying out the Work <br /> or for any payments required for unemployment compensation under Title 50 RCW or <br /> for industrial insurance and medical aid required under Title 51 RCW. <br /> Failure of the Contractor to perform all of the Contractor's obligations under the Contract <br /> shall not bar the City from unilaterally certifying the Contract complete so the Engineer <br /> may calculate a final contract price as provided in 1-09.9 PAYMENTS. <br /> 1-05.13 Superintendents, Labor and Equipment of Contractor <br /> Delete 1-05.13. <br /> 1-05.14 Cooperation With Other Contractors <br /> Delete all of 1-05.14 and substitute the following: <br /> Nothing in the Contract shall be interpreted as granting to the Contractor exclusive <br /> occupancy of the Project area. The Contractor shall ascertain to its own satisfaction the <br /> scope of the Project and the nature of any other contracts that have been or may be <br /> awarded by the City in the construction of the Project, or to the end that the Contractor <br /> may perform this Contract in the light of such other contracts, if any. <br /> The Contractor shall not cause unnecessary hindrance or Delay to others working on <br /> this or other projects. If the performance of a contract for the Project is likely to be <br /> interfered with by the simultaneous performance of some other contract or contracts, the <br /> Engineer will decide which Contractor shall cease Work temporarily and which <br /> Contractor shall continue, or whether the Work under the contracts can be coordinated <br /> so that the contractors may proceed simultaneously. On all questions concerning <br /> conflicting interest of contractors performing related Work, the decision of the Engineer <br /> shall be binding upon all contractors concerned and the City, the Engineer, the City's <br /> Representative, and their consultants shall not be responsible for any damages suffered <br /> or extra costs incurred by the Contractor resulting directly or indirectly from the Award or <br /> performance or attempted performance of any other contract or contracts on the Project <br /> or caused by a decision or omission of the Engineer respecting the order of precedence <br /> in the performance of the contracts. <br /> If, through acts of neglect on the part of the Contractor, any others suffer loss or damage <br /> on the Work, the Contractor agrees to resolve such loss or damage fairly and <br /> expeditiously. If such other shall assert any claim against the City, the Engineer, the <br /> City's Representative, or their consultants on account of any damage alleged to have <br /> been so sustained, the City shall notify the Contractor, who shall hold harmless, <br /> indemnify, and defend the City, Engineer, the City's Representative, and their <br /> consultants, and each of their directors, officers, employees, and agents against any <br /> such claim, including all attorney's fees and any other costs incurred by the indemnified <br /> parties relative to any such claim. <br /> The Contractor shall coordinate its work with other contractors and utility companies that <br /> may have facilities in the Project area and cooperate with them. The Contractor shall <br /> Shore Avenue Force Main Division 1 —GENERAL REQUIREMENTS February 24, 2022 <br /> WO No—UP3734 SP—62 <br />
The URL can be used to link to this page
Your browser does not support the video tag.