My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Redtail LLC 6/24/2022
>
Contracts
>
Capital Contract
>
Redtail LLC 6/24/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 10:48:54 AM
Creation date
7/8/2022 11:00:48 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Redtail LLC
Approval Date
6/24/2022
Council Approval Date
5/25/2022
Department
Public Works
Department Project Manager
Candice Au-Yeung
Subject / Project Title
Shore Avenue Force Main
Tracking Number
0003403
Total Compensation
$855,032.99
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Redtail LLC 4/27/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Redtail LLC 5/25/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
508
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> also coordinate its activities with the City; and no water mains, individual water services, <br /> street, or private driveways may be closed off without a minimum of five working days <br /> notice to the City and the private property owner. Should the property owner or the City <br /> have adequate reason, as determined by the Engineer, to avoid access or water service <br /> shutoff at the scheduled time, the Contractor shall reschedule its work to meet the new <br /> condition. <br /> Final grading to subgrade and subgrade preparation in those areas disturbed by the <br /> utilities companies shall be the responsibility of the Contractor and included in the street <br /> construction and no additional compensation will be paid. <br /> The Contractor shall cooperate with the utility companies and their subcontractors and <br /> so conduct its operations that the necessary construction of their facilities can be <br /> accomplished to the mutual satisfaction of the City of Everett and the utility companies. <br /> Supplement Section 1-05 by adding the following new subsections: <br /> 1-05.16 Water and Power <br /> (******) <br /> The Contractor shall make necessary arrangements, and shall bear the costs for power and <br /> water necessary for the performance of the Work, unless the Contract includes power and <br /> water as a pay item. <br /> Contractor shall pay all power and water costs until Substantial Completion, whether such <br /> power or water is provided by temporary or permanent facilities. City shall not be liable for <br /> any costs or Delays arising out of or caused by the availability or lack of availability of <br /> permanent power or utilities. <br /> 1-05.17 Oral Agreements <br /> (******) <br /> No oral agreement or conversation with any officer, agent, or employee of the City, either <br /> before or after execution of the Contract, shall affect or modify any of the terms or obligations <br /> contained in any of the documents comprising the Contract. Such oral agreement or <br /> conversation shall be considered as unofficial information and in no way binding upon the <br /> City, unless subsequently put in writing and signed by the City. <br /> 1-05.18 Contractor <br /> (******) <br /> 1-05.18(1) Contractor's Representative <br /> The Contractor shall notify the City in writing of the name of the person who will act as <br /> the Contractor's representative, will have the authority to act in matter relating to this <br /> Contract, and will be delegated with authority to act as the Contractor's emergency <br /> contact. This person shall have authority to carry out the provisions of the Contract and <br /> to supply materials, Equipment, tools and labor without delay for the performance of the <br /> Work. <br /> Contractor shall employ and keep on site on a full time basis personnel experienced in <br /> the management of construction of projects of this size and type. These shall include, <br /> but not be limited to, a project manager and superintendent. Unless the City agrees <br /> otherwise in writing, neither the Contractor's project manager nor the superintendent <br /> shall have supervisory responsibility for other projects for the Contractor while assigned <br /> to this Project. Contractor shall employ and assign such additional, full time office, <br /> support and engineering personnel to support the project manager and superintendent <br /> and allow timely completion of the Project. The project manager and superintendent <br /> shall be approved by the City, and such approval shall not be unreasonably withheld. <br /> Shore Avenue Force Main Division 1 -GENERAL REQUIREMENTS February 24, 2022 <br /> WO No-UP3734 SP-63 <br />
The URL can be used to link to this page
Your browser does not support the video tag.