Redtail LLC 6/24/2022
>
Contracts
>
Capital Contract
>
Redtail LLC 6/24/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 10:48:54 AM
Creation date
7/8/2022 11:00:48 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Redtail LLC
Approval Date
6/24/2022
Council Approval Date
5/25/2022
Department
Public Works
Department Project Manager
Candice Au-Yeung
Subject / Project Title
Shore Avenue Force Main
Tracking Number
0003403
Total Compensation
$855,032.99
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Redtail LLC 4/27/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Redtail LLC 5/25/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
508
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-05.18(3)1 Public Safety and Convenience <br /> The Contractor shall conduct its work so as to ensure the least possible obstruction <br /> to traffic and inconvenience to the general public, business, organizations and <br /> residents in the vicinity of the Work and to reasonably protect persons and property. <br /> No roads or street shall be closed to the public except with the permission of the <br /> City's Representative and the proper governmental authority. Fire hydrants on or <br /> adjacent to the Work shall be accessible to firefighting equipment. Temporary <br /> provisions shall be made by the Contractor for the use of sidewalks, private and <br /> public driveways and proper functioning of gutters, sewer inlets, drainage ditches <br /> and culverts, irrigation ditches and natural water courses. <br /> 1-05.19 City-Contractor Coordination <br /> (******) <br /> 1-05.19(1) Suggestions to Contractor <br /> Nothing in these Contract Documents requires the City's Representative to provide the <br /> Contractor with direction or advice on how to do the Work, construction practices, or <br /> means and methods. If the City's Representative approves, suggests or recommends <br /> any construction practice, means, method or manner for doing the Work or producing <br /> materials, the approval or recommendation shall not: (A) guarantee that following the <br /> method or manner will result in compliance with the Contract Documents; (B) relieve the <br /> Contractor of any risks or obligations under the Contract Documents; or (C) create <br /> liability by the City to the Contractor. <br /> Suggestions as to the plans or methods of accomplishing the Work or Contract <br /> requirements by the City or the City's Representative to the Contractor but not specified <br /> or required, if adopted or followed by the Contractor in whole or in part, shall be used at <br /> the risk and responsibility of the Contractor. The City and the City's Representative <br /> assume no responsibility therefore and in no way will be held liable for any defects in <br /> the Work which may result from or be caused by use of such plan or method of Work. <br /> 1-05.19(2) Meetings with City <br /> The Contractor shall have its duly authorized representative attend periodic <br /> informational meetings with the City's Representative and City staff, as reasonably <br /> required by the City. <br /> Contractor, City, and City's Representative shall meet as often as determined by the <br /> City's Representative, but no less often than once each month. The purpose of the <br /> meeting is to review Project status in relation to the construction schedule; review value <br /> of Work completed during the previous month; and, if applicable, review Contractor's <br /> plans to return Project status to that required by the schedule. If requested by the City <br /> or City's Representative, the Contractor shall submit a written progress report within five <br /> days following this meeting, comprising: <br /> The current construction schedule indicating percent complete, actual completion or <br /> start dates since the previous review, the estimated remaining duration for each activity <br /> in progress, Schedule of Values update, and narrative summary. <br /> Reasons any activities are behind schedule and the corrective steps being taken. <br /> 1-05.19(3) Cooperation with Others <br /> The Contractor agrees to permit entry to the work site by the City, its employees or other <br /> contractors performing Work on behalf of the City. The Contractor shall afford to the <br /> City, other contractors and their employees, reasonable facilities and cooperation and <br /> arrange its work and dispose of its materials in such a manner as to not interfere with <br /> the activities of the City or of others upon the site of Work. The Contractor shall promptly <br /> make good Contractor-caused injury or damage to persons or property that may be <br /> Shore Avenue Force Main Division 1 —GENERAL REQUIREMENTS February 24,2022 <br /> WO No—UP3734 SP—66 <br />