My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Redtail LLC 6/24/2022
>
Contracts
>
Capital Contract
>
Redtail LLC 6/24/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 10:48:54 AM
Creation date
7/8/2022 11:00:48 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Redtail LLC
Approval Date
6/24/2022
Council Approval Date
5/25/2022
Department
Public Works
Department Project Manager
Candice Au-Yeung
Subject / Project Title
Shore Avenue Force Main
Tracking Number
0003403
Total Compensation
$855,032.99
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Redtail LLC 4/27/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Redtail LLC 5/25/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
508
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> sustained by other contractors or employees of the City. The Contractor shall join its <br /> Work to that of others and perform its Work in proper sequence in relation to that of <br /> others. <br /> If requested by the Contractor, the City will arrange meetings with other contractors <br /> performing Work on behalf of the City to plan coordination of construction activities. The <br /> Contractor shall inform itself of the planned activities of other contractors and will <br /> coordinate its Work with the other contractors. <br /> Contractor shall notify the City of problems, interference or any difficulty with other <br /> contractors or workers engaged by the City. The Notice shall be sufficiently prompt and <br /> specific so as to allow the City to mitigate or avoid increased costs, time of performance, <br /> damages or injury. Contractor's failure to provide such Notice in a timely way shall be <br /> deemed a waiver and release of any and all Contract Claims relating to, arising out of, <br /> or caused by, any alleged interference, difficulty or problem with another contractor or <br /> worker engaged by the City. <br /> 1-06 CONTROL OF MATERIAL <br /> Supplement Section 1-06 as follows: <br /> References to materials shall also mean Contractor furnished Equipment, if any, as specified <br /> in these Special Provisions. <br /> 1-06.1 Approval of Materials Prior to Use <br /> Revise the first paragraph of 1-06.1 to read as follows: <br /> Prior to use, Contractor shall notify the Engineer of all proposed materials. Contractor <br /> may use the Qualified Product List (QPL) and the Aggregate Source Approval (ASA) <br /> Database. Contractor shall use the Request for Approval of Material (RAM)form. <br /> Supplement 1-06.1 by adding the following: <br /> Contractor shall provide product data, when specified, in accordance with 1-05.3(1) <br /> SUBMITTALS of these Special Provisions for inspecting, testing, operating, or <br /> maintaining Equipment and materials supplied as part of the Work. Unless otherwise <br /> specified, such data shall be provided at the time the referenced material or Equipment <br /> is delivered to the job site. Contractor shall provide data as specified and include, unless <br /> otherwise specified, but not be limited to shop drawings, erection drawings, reinforcing <br /> steel schedules, testing and adjusting instructions, operations manuals, maintenance <br /> procedures, parts lists, and record drawings. Contractor shall provide data as part of <br /> the Work under this Contract and its acceptability will be determined by the City in its <br /> sole discretion. <br /> Further supplement 1-06.1 by adding the following: <br /> 1-06.1(5) Requests for Substitution <br /> (******) <br /> The City will not usually consider a substitution for material or Equipment specified by <br /> brand name or manufacturer or sole-sourced. <br /> Only the Contractor may offer materials or Equipment of equal or better quality and <br /> performance as a substitution for those specified. The Contractor shall make <br /> substitution offers in writing to the City's Representative in accordance with 1-05.3(1) <br /> SUBMITTALS of these Special Provisions. The substitution offer must include sufficient <br /> data to enable the City's Representative to assess the acceptability of the material or <br /> Equipment for the particular application and requirements. The City and City's <br /> Representative are not required or obligated to consider or review a request for <br /> substitution and may, in their sole discretion and option, consider or review such <br /> requests. <br /> Shore Avenue Force Main Division 1 —GENERAL REQUIREMENTS February 24, 2022 <br /> WO No—UP3734 SP—67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.