Template:
Contracts
Contractor's Name
Redtail LLC
Approval Date
6/24/2022
Council Approval Date
5/25/2022
Department
Public Works
Department Project Manager
Candice Au-Yeung
Subject / Project Title
Shore Avenue Force Main
Tracking Number
0003403
Total Compensation
$855,032.99
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Redtail LLC 4/27/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Redtail LLC 5/25/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
508
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> If the offered substitution requires changes to or coordination with other portions of the <br /> Work, include, if any, drawings and details showing such changes. The Contractor <br /> agrees to perform these changes as part of the substitution of material or Equipment at <br /> no additional cost to the City. Approval of a substitution request will not relieve the <br /> Contractor from responsibility for the efficiency, quality, and performance of the <br /> substitute material or Equipment, in the same manner and degree as the material and <br /> Equipment originally specified. Reflect cost differential associated with a substitution in <br /> the offer. If the City approves the substitution, the Contract Documents will be modified <br /> by a Change Order modifying the Contract Sum in the amount of the cost differential. <br /> 1-06.2 Acceptance of Materials <br /> 1-06.2(2)B Financial Incentive <br /> Delete 1-06.2(2)B. <br /> 1-06.2(2)D Quality Level Analysis <br /> Delete 1-06.2(2)D. <br /> 1-06.3 Manufacturer's Certificate of Compliance <br /> Supplement 1-06.3 by adding the following: <br /> When authorized by the Standard Specifications or these Special Provisions and prior <br /> to use, the Engineer may accept certain Equipment on the basis of a Manufacturer's <br /> Certificate of Compliance as an alternate to Equipment inspection and testing. <br /> A Manufacturer's Certificate of Compliance shall be reserved for cases where <br /> compliance to Contract requirements is not readily determinable through inspection and <br /> testing of materials or Equipment. The Contractor shall provide properly authenticated <br /> documents to the City's Representative that the materials and Equipment comply with <br /> the Contract requirements. <br /> The Contractor shall pay all associated costs of providing each Manufacturer's <br /> Certificate of Compliance submitted for City acceptance. <br /> The City reserves the right to refuse to accept Equipment on the basis of a <br /> Manufacturer's Certificate of Compliance. <br /> 1-06.3(1) Inspection at Point of Manufacturing <br /> (******) <br /> The Contractor shall be responsible to reimburse the City for the costs of inspections at <br /> the point of manufacturing for inspections occurring outside of Whatcom, Skagit, Island, <br /> Snohomish, King, Pierce and Thurston counties. Costs to be paid or reimbursed by the <br /> Contractor include, but are not limited to, travel, subsistence, labor and lodging <br /> expenses of the City Inspector. <br /> Point of manufacturing inspection will be required if: <br /> Inspection and testing of materials or Equipment in the vicinity of the Work by the <br /> City is not practicable, <br /> The Contractor requests the City to inspect and test material or Equipment at the <br /> point of manufacture, or <br /> The Standard Specifications or these Special Provisions require that inspection, <br /> testing or witnessing of tests take place at the point of manufacture. <br /> 1-06.4 Handling and Storing Materials <br /> Supplement 1-06.4 by adding the following: <br /> Contractor shall store materials and Equipment so as to insure the preservation of their <br /> quality and fitness for the Work. Contractor shall store Equipment and materials at <br /> Shore Avenue Force Main Division 1 -GENERAL REQUIREMENTS February 24, 2022 <br /> WO No-UP3734 SP-68 <br />
The URL can be used to link to this page
Your browser does not support the video tag.