My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4919 S 2ND AVE LIFT STATION 17 2022-07-13
>
Address Records
>
S 2ND AVE
>
4919
>
LIFT STATION 17
>
4919 S 2ND AVE LIFT STATION 17 2022-07-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2022 1:06:49 PM
Creation date
7/13/2022 1:06:42 PM
Metadata
Fields
Template:
Address Document
Street Name
S 2ND AVE
Street Number
4919
Tenant Name
LIFT STATION 17
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6/29/2022 Page 1 <br /> City of Everett <br /> 1:23:28PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E2106-139 Site Address 2919 S 2ND AVE <br /> Applied 6/16/2021 Applicant KEN CHRISTIANSEN Lot <br /> Approved 6/16/2021 Owner CITY OF EVERETT Block <br /> Issued 6/16/2021 Contractor OWNER Tract <br /> Parent Permit No. Description REPLACE 110KW BACKUP GENERATOR&225AAUTOMATI( <br /> Notes SWITCH W/ANEW 125KW GENERATOR&225A AUTOMATIC TRANSFER SWITCH AT SEWER <br /> LIFT STATION 17. <br /> Scheduled Completed Tune Inspector Result Remarks Inspector's Comments <br /> 12/10/2021 12/10/2021 PERMIT AEA APPROVAL EM REQUEST <br /> EXTENSION <br /> 4/19/2022 4/19/2022 ELEC 02-GROUND SKB APPROVAL eTRAKiT Inspection 4/14/2022 8:06 AM Kendall Christiansen <br /> WORK Request Ground work to inspect conduits prior to <br /> backfill. <br /> Contact Name:Kendall Christiansen <br /> Site Address:2919 S 2ND AVE <br /> Phone:4253090470 <br /> e-Mail:kchristiansen@everettwa.gov <br /> (4/19/2022 9:35 AM SKB) <br /> Service to building ATS and tie ins. <br /> 5/24/2022 5/24/2022 ELEC 06-ROUGH SKB PARTIAL APPR eTRAKiT Inspection 5/23/2022 9:49 AM Kendall Christiansen <br /> IN Request Inspect generator installation and automatic <br /> transfer switch. <br /> Contact Name:Kendall Christiansen <br /> Site Address:2919 S 2ND AVE <br /> Phone:4253090470 <br /> e-Mail:kchristiansen@everettwa.gov <br /> (5/24/2022 10:36 AM SKB) <br /> skb changed Inspection Type from ELEC <br /> 09-OTHER to ELEC 06-ROUGH IN <br /> (5/24/2022 11:00 AM SKB) <br /> OK generator,connection Feeder to ATS to <br /> Load bank connection box and load and <br /> line side of ATS OK. <br /> 6/28/2022 6/28/2022 ELEC 10-FINAL SKB APPRVD-PERK eTRAKiT Inspection 6/23/2022 4:02 PM Kendall Christiansen <br /> Request Inspect new service disconnect and PUD <br /> meter cabinet.Requesting afternoon <br /> inspection,PUD performing shut down in <br /> the morning,and we will need an inspection <br /> for PUD to reconnect. <br /> Contact Name:Kendall Christiansen <br /> Site Address:2919 S 2ND AVE <br /> Phone:4252577230 <br /> e-Mail:kchristiansen@everettwa.gov <br /> (6/28/2022 1:52 PM SKB) <br /> Owner is moving the grounding electrode <br /> into the service disconnect and loading the <br /> neutral in the subpanel. <br /> 6/28/2022 6/28/2022 ELEC 05-SERVICE SKB APPROVAL <br /> INSP12 CriWSYSTE M S <br />
The URL can be used to link to this page
Your browser does not support the video tag.