My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2801 10TH ST 2022-07-28
>
Address Records
>
10TH ST
>
2801
>
2801 10TH ST 2022-07-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2022 11:49:12 AM
Creation date
7/13/2022 2:17:02 PM
Metadata
Fields
Template:
Address Document
Street Name
10TH ST
Street Number
2801
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6/21/2021 Page 2 / 2 <br /> 10:50:35AT v� City of Everett L <br /> INSPECTION ACTIVITY REPORT <br /> 1/22/2021 1/22/2021 ELEC 06-ROUGH MCB APPROVAL eTRAKiT Inspection 1/21/2021 9:20 AM Valentyn Peshko <br /> IN Request Area-C hard lid area,cover inspection <br /> Contact Name:Eugene Kazakov <br /> Site Address:2801 10TH ST <br /> Phone:3607088533 <br /> e-Mail:admin@vppoweron.com <br /> (1/22/2021 2:28 PM MCB) <br /> mcb changed Inspection Type from ELEC <br /> 08-OTHER to ELEC 06-ROUGH IN <br /> (1/26/2021 6:17 AM MCB) <br /> Ok themostat sleaves <br /> 2/22/2021 2/22/2021 ELEC 06-ROUGH MCB NOT READY eTRAKiT Inspection 2/19/2021 1:03 PM Valentyn Peshko <br /> IN Request Ceiling Cover Level 1 and 2 Admin. <br /> Moming inspection if possible. <br /> Contact Name:Valentyn Peshko <br /> Site Address:2801 10TH ST <br /> Phone:3606307075 <br /> e-Mail:admin@vppoweron.com <br /> (2/22/2021 4:13 PM MCB) <br /> Units not made up? <br /> 2/24/2021 2/24/2021 ELEC 07-TGRID SKB APPROVAL eTRAKiT Inspection 2/23/2021 11:24 AM Valentyn Peshko <br /> Request Ceiling Cover Level 2 Admin <br /> Call Eugene Kazakov when on site. <br /> Phone 360-708-8533 <br /> Morning Inspection if possible. <br /> Contact Name:Valentyn Peshko <br /> Site Address:2801 10TH ST <br /> Phone:3606307075 <br /> e-Mail:admin@vppoweron.com <br /> (2/24/2021 1:27 PM SKB) <br /> First and second floor T-grid complete. <br /> 6/15/2021 6/15/2021 ELEC 09-FINAL MCB APPRVD-PERK eTRAKiT Inspection 6/14/2021 2:26 PM Valentyn Peshko <br /> Request Call Eugene Kasakov before inspection and <br /> morning inspection if possible.(360) <br /> 708-8533 <br /> Contact Name:Valentyn Peshko <br /> Site Address:2801 10TH ST <br /> Phone:3606307075 <br /> e-Mail:admin@vppoweron.com <br /> INSP12 CRWs YS T <br />
The URL can be used to link to this page
Your browser does not support the video tag.