My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12800 19TH AVE SE 2022-07-14
>
Address Records
>
19TH AVE SE
>
12800
>
12800 19TH AVE SE 2022-07-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2022 9:15:35 AM
Creation date
7/14/2022 9:15:13 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
12800
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11/4/2021 Page 1 <br /> 2:01:53PM City of Everett <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. B2109-065 Site Address 12800 19TH AVE SE <br /> Applied 9/21/2021 Applicant Sean Rankin Lot <br /> Approved 10/1/2021 Owner PROVIDENCE HEALTH&SERVICES Block <br /> Issued 10/4/2021 Contractor FERRIS/TURNEY GEN CONTRS INC Tract <br /> Parent Permit No. Description Insulation,Sheetrock,ACT Ceiling Revision <br /> Notes Insulate and sheetrock existing wall 184sf total,revise ACT to room layout 299SFT total Room Size <br /> Requested Scheduled Result <br /> Time/By Completed Inspection Type Inspector Remarks Notes <br /> 10/4/2021 10/5/2021 BLDG 13-CEILING KMK NOT READY 10/4/2021 9:08 AM Sean Rankin <br /> 09:08 EPRS 10/5/2021 GRID See notes <br /> Contact Name:Sean Rankin <br /> Site Address: 12800 19TH AVE SE <br /> Phone:2068890102 <br /> e-Mail:SeanR@Ferris-Tumey.com <br /> (10/5/2021 3:26 PM KMK) <br /> Complete electrical final. <br /> Recall for buildling final when ready <br /> 10/4/2021 10/5/2021 BLDG KMK APPROVAL 10/4/2021 9:08 AM Sean Rankin <br /> 09:08 EPRS 10/5/2021 10-DRYWALL walls only(photo provided) <br /> Contact Name:Sean Rankin <br /> Site Address: 12800 19TH AVE SE <br /> Phone:2068890102 <br /> e-Mail:SeanR@Ferris-Turney.com <br /> 10/4/2021 10/5/2021 BLDG KMK APPROVAL 10/4/2021 9:08 AM Sean Rankin <br /> 09:08 EPRS 10/5/2021 12-INSULATION walls only(phote provided) <br /> Contact Name:Sean Rankin <br /> Site Address:12800 19TH AVE SE <br /> Phone:2068890102 <br /> e-Mail:SeanR@Ferris-Turney.com <br /> 10/14/2021 10/18/2021 BLDG 16-FINAL KMK APPRVD-PERK 10/14/2021 12:16 PM Sean Rankin <br /> 12:16 EPRS 10/18/2021 see photos sean link E2109-101 <br /> Contact Name:Sean Rankin <br /> Site Address: 12800 19TH AVE SE <br /> Phone:2068890102 <br /> e-Mail:SeanR@Ferris-Turney.com <br /> 10/14/2021 10/18/2021 BLDG 13-CEILING KMK APPROVAL 10/14/2021 12:16 PM Sean Rankin <br /> 12:16 EPRS 10/18/2021 GRID Photos ok <br /> Contact Name:Sean Rankin <br /> Site Address: 12800 19TH AVE SE <br /> Phone:2068890102 <br /> e-Mail:SeanR@Ferris-Turney.com <br /> 11/4/2021 11/4/2021 ADMEN USE CRB APPROVAL (11/4/2021 2:01 PM CRB) <br /> 14:00 CRB 11/4/2021 ONLY** FINALLED PER KURTS NOTES <br /> INSP_DETAILS <br />
The URL can be used to link to this page
Your browser does not support the video tag.