My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022/07/13 Council Agenda Packet
>
Council Agenda Packets
>
2022
>
2022/07/13 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2023 4:39:37 PM
Creation date
7/14/2022 9:28:53 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/13/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERLOCAL AGREEMENT BETWEEN <br />CITY OF EVERETT AND CITY OF MUKILTEO <br />RELATING TO MUKILTEO LANE <br />1. PARTIES <br />This Interlocal Agreement Between the City of Everett and City of Mukilteo Relating to <br />Mukilteo Lane (this "Agreement") is made by and between City of Everett, a Washington <br />municipal corporation ("Everett"), and City of Mukilteo, a Washington municipal corporation <br />("Mukilteo"). Throughout this Agreement, Everett and Mukilteo are each sometimes referred to <br />individually as a "Party" and collectively as the "Parties." <br />2. PURPOSE <br />The Parties agree that: <br />• Mukilteo Lane is a local access roadway that provides sole access to multiple Mukilteo <br />residences <br />• Everett and Mukilteo corporate boundaries split the Mukilteo Lane Right of Way (R/W) <br />creating joint and adjacent operating and maintenance responsibilities <br />• Geotechnical engineering and roadway structural improvements are needed to ensure <br />ongoing preservation of, and access from Mukilteo Lane <br />• Everett and Mukilteo would mutually benefit from a geotechnical study to outline the <br />needed improvements <br />• Everett and Mukilteo have each budgeted or programmed $50,000 in 2022 toward <br />funding a joint geotechnical study of up to $100,000 to outline the needed <br />improvements. <br />3. MUKILTEO LANE GEOTECHNICAL STUDY <br />The scope of work for this project is to identify needed work to preserve the portion of Mukilteo <br />Lane that is under joint Right of Way control, which is, generally speaking, from approximately <br />1315 Mukilteo Lane to its intersection with Mukilteo Boulevard. The scope of work will include <br />an analysis of existing conditions and recommendations for stabilization of the roadway and <br />right of way. Public Works staff from both Parties by mutual agreement will add further detail to <br />the scope of work during the contracting process. Public Works staff from Mukilteo and Everett <br />will work together to select a geotechnical consultant, with Everett complying with the <br />requirements for contracting for such services under Chapter 39.80 RCW. Everett will execute a <br />professional services contract with the selected consultant and will thereafter administer the <br />contract. <br />4. THIRD PARTY BENEFICIARIES <br />There are no third -party beneficiaries to this Agreement, and this Agreement shall not be <br />interpreted to create any third -party beneficiary rights. <br />{DPK2574721.DOCX;1/00014.900175/} Interlocal Agreement — Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.