Laserfiche WebLink
6/22/202 City of Everett Page 2'2. <br /> 8:47:17AM <br /> INSPECTION ACTIVITY REPORT <br /> 6/7/2022 6/7/2022 PLUMB 08-FINAL BGA CORRECTION (6/6/2022 9:03 AM JSG) <br /> Phone:2532233636 <br /> e-Mail:hoperho@hotmail.com <br /> (6/7/2022 9:18 AM BGA) <br /> 1.Replace toilet tanks in both restrooms so <br /> flush handles are on the right side for ADA <br /> compliance. <br /> 2.Remove pop up drain on one Lavatory <br /> and replace with commercial grid strainer <br /> tailpiece. <br /> 6/21/2022 6/21/2022 PLUMB 08-FINAL BGA APPRVD-PERN (6/17/2022 10:41 AM JSG) <br /> 253-223-3636 <br /> hoperho@hotmail.com <br /> Inspection originally scheduled for 6/22/22. <br /> INSP12 C sYSTEMS <br />