Laserfiche WebLink
12/20/2021 City of Everett Page 2 I <br /> 9:18:35AM <br /> INSPECTION ACTIVITY REPORT <br /> 12/14/2021 12/14/2021 ELEC 09-FINAL SKB CORRECTION (12/13/2021 12:02 PM SKB) <br /> Contact Name:Stephen Bowser <br /> Site Address:3200 35TH AVE NE <br /> Phone:2068497372 <br /> e-Mail:Stephen.b@shjelectric.com <br /> (12/13/2021 12:02 PM SKB) <br /> Prefers first stop lOish. <br /> (12/14/2021 9:35 AM SKB) <br /> Provide proper sized overcurrent device for <br /> controller.Secure unistrut to secure <br /> conduits. <br /> 12/15/2021 12/15/2021 ELEC 09-FINAL SKB APPRVD-PER1 eTRAKiT Inspection 12/14/2021 3:51 PM Stephen Bowser <br /> Request Corrections completed. <br /> Contact Name:Stephen Bowser <br /> Site Address:3200 35TH AVE NE <br /> Phone:2068497372 <br /> e-Mail:Stephen.b@shjelectric.com <br /> 1NSP12 CM/S YS TEMS <br />