Laserfiche WebLink
• • <br /> Drew Martin <br /> From: Drew Martin <br /> Sent: Friday,July 23, 2021 10:31 AM <br /> To: Irina Ticu <br /> Cc: Carlson,Jim <br /> Subject: City of Everett Permit Services: 1525 75th Street SW(M2107-056) - First Building Review <br /> Good morning, Irina. <br /> I have a few comments for the design team to address. This email will serve as the review letter. I also spoke with the <br /> structural engineer regarding the evaluation of the roof to support the new RTU; I am copying him to bring everyone <br /> into the same conversation and help expedite responses. <br /> Depending on how the comments are addressed, I can receive supplemental information electronically(e.g., a few pages <br /> of supplemental calculations, missing details to tape into the drawings, etc.). If more significant changes to the drawings <br /> are required,we'll need two complete revised sets. In either case, a single coordinated response letter should be <br /> included to clarify how the comments have been addressed. <br /> Comments <br /> 1. The project appears to include replace of ducts throughout the space. Verify that the ducts do not penetrate <br /> fire-rated assemblies. If rated assemblies are penetrated, details are required. Fire/smoke dampers should be <br /> specified where required. See IBC Sections 714 and 717. <br /> 2. The project appears to include hanging units weighing more than 20 pounds.Support details that include <br /> seismic bracing should be included in the construction drawings. Where supports impose loads on truss chords <br /> between web connection points, supplemental web bracing should be provided as needed. Structural <br /> calculations should be included substantiating the design of the supports and bracing. See IBC Sections 1604.1 <br /> and 1613.1, and ASCE 7-16 Sections 13.1.4 Item 6(c)(ii) and 13.6. <br /> 3. The structural calculations include an evaluation of the roof framing supporting the new RTU. See IBC Section <br /> 1604.1. The following comments should be addressed: <br /> a. The weight of the RTU was considered. A 300-pound exhaust fan will be located immediately adjacent <br /> to the RTU and should be included in the combined weight. <br /> b. The framing analysis should include other equipment being supported by the same framing as the new <br /> RTU. <br /> c. The analysis does not appear to include snow loading. See IBC Section 1605. The snow load may be <br /> considered using either of the following approaches: <br /> i. ASCE 7-16 Chapter 7, including all concurrent effects(e.g., unbalanced loading, drifts, rain <br /> surcharge, etc.). <br /> ii. Uniform 25 psf snow load per the SEAW/WABO White Paper recommendations. Concurrent <br /> effects per ASCE 7-16 are not required when this load is used. <br /> Please let me know if you have questions. <br /> Drew Martin, P.E.,S.E. <br /> - Associate Engineer—Commercial Plans Examiner I Permit Services <br /> 425.257.8813 13200 Cedar Street, 2nd Floor, Everett,WA 98201 <br /> EVERETT Hours: M/W/Th/F: 7:30am-12:OOpm & 1:00pm-3:00pm;Tu: 1:00pm-3:00pm <br /> 1 <br />