My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1615 75TH ST SW PACE 2022-07-14
>
Address Records
>
75TH ST SW
>
1615
>
PACE
>
1615 75TH ST SW PACE 2022-07-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2022 2:14:15 PM
Creation date
7/14/2022 2:13:31 PM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1615
Tenant Name
PACE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2/3/2022 Page 1 <br /> City of Everett <br /> 6:45:21AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E2108-153 Site Address 1615 75TH ST SW STE 220 <br /> Applied 8/20/2021 Applicant THOMPSON ELECTRICAL CONTR INC Lot <br /> Approved 8/20/2021 Owner EVERETT TECH PARK I Block <br /> Issued 8/20/2021 Contractor THOMPSON ELECTRICAL CONTR INC Tract <br /> Parent Permit No. B2103-069 Description Administration building Providence Pace <br /> Notes PACE(Care for Elderly)Day Care for Elderly and Office Business Portions <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 9/30/2021 9/30/2021 ELEC 06-ROUGH MCB PARTIAL APPR (9/30/2021 12:03 PM MCB) <br /> IN Ok hard lids and soffits <br /> 10/6/2021 10/6/2021 ELEC 06-ROUGH MCB PARTIAL APPR Aaron/253-212-5122 <br /> IN <br /> (10/6/2021 2:44 PM MCB) <br /> Ok walls and west half hard lids.Note all <br /> green Mc in walls <br /> 10/12/2021 10/12/2021 ELEC 06-ROUGH MCB PARTIAL APPR (10/11/2021 1:24 PM SLM) <br /> IN Aaron 253-212-5122 <br /> (10/12/2021 3:31 PM MCB) <br /> Ok hard lids except for lobby area <br /> 11/18/2021 11/18/2021 ELEC 09-FINAL MCB PARTIALAPPR Aaron 253-212-5122 <br /> (11/18/2021 2:12 PM MCB) <br /> Ok except for unfinished it room <br /> 12/20/2021 12/20/2021 ELEC 06-ROUGH MCB APPROVAL Aaron 253-212-5122 <br /> IN <br /> 2/2/2022 2/2/2022 ELEC 09-FINAL MCB APPRVD-PERIv Steve <br /> 253-212-5122 <br /> INSP12 CRWIrsYSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.