My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1410 119TH PL SE 2022-07-19
>
Address Records
>
119TH PL SE
>
1410
>
1410 119TH PL SE 2022-07-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2022 1:39:05 PM
Creation date
7/14/2022 2:45:08 PM
Metadata
Fields
Template:
Address Document
Street Name
119TH PL SE
Street Number
1410
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r 0 <br /> StructuralAssoctatc <br /> ^ -- 1 krigineerittgStrurcture.s to Lost <br /> x� /f <br /> 1 y\. <br /> Sail 901$( <br /> October 9, 2020 D ECLUVED <br /> Subject: Baker Addition — Response to City Comments OCT 1 3 2020 <br /> Subject Address: 1410 1 19`t' PL SE Everett, WA 98208 <br /> Plan Check No: B2008-024 CITY OF EVERETT <br /> SDA Job No. 9013C Permit Services <br /> To whom this may concern. <br /> At the request of Rhonda Baker, this office reviewed the subject project to answer the building <br /> official comments. <br /> Following is our response to those comments- <br /> General: Comments 1-8 by NuttyCad. <br /> Energy: Comments 1-3 by NuttyCad. <br /> Structural: <br /> 1) Special Inspection updated on S I.0 to include shear wall inspections. <br /> 2) The anchor bolt spacing is clarified to reference the shear wall schedule. The minimum <br /> clearance of 8" between the grade and framing is now specified. The foundation <br /> dimensions are clarified in the details and plan set. <br /> 3) Sections are updated on the revised plan set. <br /> 4) Shearwall locations and straps are clarified on the revised plans set. <br /> 5) Roof framing is specified on the revised plan set. <br /> 6) Floor cantilever framing and roof framing is clarified on the revised plan set. <br /> 7) The framing supporting the posts is clarified in the revised plan set. <br /> 8) The proposed construction of the exterior deck (north end of the Upper Floor) is clarified <br /> on the revised plan set. <br /> 9) Provided by NuttyCad. <br /> 10)Structural calculations are included with the revised plan set. Beams are labeled with ID <br /> tags. Overstrength and vertical seismic effect are included as shown in the load cases <br /> used in the beam design. <br /> 11)Shear wall locations and strap locations are clarified in the revised plan set. Horizontal <br /> straps used for Force Transfer Around Opening design are drawn and referenced on the <br /> revised plan set. <br /> 12)Post-installed holdown calculations are included with the revised plan set. Concrete <br /> testing for f'c=2,500PSI prior to construction is specified on S 1.0 and Foundation Plan. <br /> Structural Design Associates <br /> 3006 Plucker A VC_ Ev.Crutt_WA 98201 <br /> Phi 42�-3$Q...t293 Fax: 425-> 2-0916 sdaeverctt:.ec n <br />
The URL can be used to link to this page
Your browser does not support the video tag.