My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1410 119TH PL SE 2022-07-19
>
Address Records
>
119TH PL SE
>
1410
>
1410 119TH PL SE 2022-07-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2022 1:39:05 PM
Creation date
7/14/2022 2:45:08 PM
Metadata
Fields
Template:
Address Document
Street Name
119TH PL SE
Street Number
1410
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6/29/2022 Page <br /> City of Everett <br /> 1:21:23PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. B2008-024 Site Address 1410 119TH PL SE <br /> Applied 7/31/2020 Applicant Lot <br /> Approved 11/2/2020 Owner BAKER RHONDA L Block <br /> Issued 11/3/2020 Contractor DETOUR REMODELING&CONST Tract <br /> Parent Permit No. Description ADD 2ND STORY MASTER BED&BATH OVER MAIN FLOOF <br /> Notes SEPARATE PLUMBING,MECHANICAL AND ELECTRICAL PERMITS ARE REQUIRED. <br /> Scheduled Completed Tvne Inspector Result Remarks Inspector's Comments <br /> 12/1/2020 12/1/2020 BLDG KMK APPROVAL as noted 11/30/2020 8:32 PM Refugio Camilo <br /> 03-FOUNDATION we like to request after inspection <br /> Please call Cuco#425-948-9487 to <br /> confirm.Thanks <br /> Contact Name:Refugio Camilo <br /> Site Address: 1410 119TH PL SE <br /> Phone:4259489487 <br /> e-Mail:info@drcconstruction.net <br /> (12/1/2020 2:40 PM KMK) <br /> Contractor adding UFER as discussed and <br /> STHD's per plan <br /> 4/5/2021 4/5/2021 BLDG KMK APPROVAL eTRAKiT Inspection 3/30/2021 10:07 PM Refugio Camilo <br /> 03-FOUNDATION Request Basement extra footings to reinforce <br /> existing concrete walls <br /> Contact Name:Refugio Camilo <br /> Site Address:1410 119TH PL SE <br /> Phone:4259489487 <br /> e-Mail:info@drcconstruction.net <br /> 4/22/2021 4/22/2021 BLDG KMK PARTIAL APPR See notes (4/22/2021 3:21 PM KMK) <br /> 07-EXTERIOR Upper floor fire rated side only.Ok to <br /> densglass the upper floor on this side. <br /> 4/22/2021 4/22/2021 BLDG KMK PARTIAL APPR See notes 4/19/2021 6:13 AM Refugio Camilo <br /> 12-INSULATION First floor partial shear nailing <br /> Contact Name:Refugio Camilo <br /> Site Address:1410 119TH PL SE <br /> Phone:4259489487 <br /> e-Mail:info@drcconstruction.net <br /> (4/22/2021 3:20 PM KMK) <br /> Lower floor exterior walls are insulated with <br /> min R21. <br /> 5/12/2021 5/12/2021 BLDG KMK APPROVAL see notes 5/11/2021 11:13 PM Refugio Camilo <br /> 07-EXTERIOR Partial wall shear <br /> Contact Name:Refugio Camilo <br /> Site Address: 1410 119TH PL SE <br /> Phone:4259489487 <br /> e-Mail:info@drcconstruction.net <br /> (5/12/2021 12:39 PM KMK) <br /> Ok denseglass on west side. <br /> 8/23/2021 8/23/2021 BLDG DWF CORRECTION 8/19/2021 9:16 PM Refugio Camilo <br /> 08-FRAMING <br /> Contact Name:Refugio Camilo <br /> Site Address: 1410 119TH PL SE <br /> Phone:4259489487 <br /> e-Mail:info@drcconstruction.net <br /> Need approved set of plans on site for <br /> inspection. <br /> Main floor <br /> #2 interior walls <br /> Shear schedule. <br /> INSP12 CM".s°- TEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.