My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1410 119TH PL SE 2022-07-19
>
Address Records
>
119TH PL SE
>
1410
>
1410 119TH PL SE 2022-07-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2022 1:39:05 PM
Creation date
7/14/2022 2:45:08 PM
Metadata
Fields
Template:
Address Document
Street Name
119TH PL SE
Street Number
1410
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6/23/2022 City of Everett Page <br /> 7:21:01AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. M2108-021 Site Address 1410 119TH PL SE <br /> Applied 8/9/2021 Applicant DETOUR REMODELING&CONST Lot <br /> Approved 8/9/2021 Owner BAKER RHONDA L Block <br /> Issued 8/9/2021 Contractor DETOUR REMODELING&CONST Tract <br /> Parent Permit No. B2008-024 Description 2 far fans,1 laundry fan <br /> Notes mechanical <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 8/10/2021 8/10/2021 MECH 04-ROUGH TAHU PARTIALAPPR eTRAKiT Inspection 8/9/2021 4:42 PM Refugio Camilo <br /> IN Request Contact name Cuco#425 948 9487 <br /> I like Request.a p.m inspection <br /> This to inspect two fart fan and laundry fan <br /> Contact Name:Refugio Camilo <br /> Site Address:1410 119TH PL SE <br /> Phone:4259489487 <br /> e-Mail:info@drcconstruction.net <br /> (8/10/2021 11:06 AM TAHU) <br /> Add gas on to mechanical permit for new <br /> fire place up stairs. <br /> Note furnace exhaust needs to be rerouted <br /> because of second floor and in 2 million.!) <br /> heating producing equipment installed shall <br /> maintain clearance to combustible's as <br /> required by the listening of the appliance <br /> and manufacturing installation instructions <br /> IMC 1402:2 and M 1306.6 <br /> Maintain and 1 inch clearance to any <br /> combustible material for the exhaust on the <br /> furnace <br /> 9/8/2021 9/8/2021 MECH 04-ROUGH SDP CORRECTION (9/8/2021 2:50 PM SDP) <br /> IN The furnace must be addressed before we <br /> can move on with this permit. <br /> The existing furnace does not meet code for <br /> venting and combustion air requirements. <br /> Please contact the mechanical inspector <br /> when you have made some decisions so we <br /> can discuss moving forward. <br /> 6/22/2022 6/22/2022 MECH 06-FINAL BGA APPRVD-PERIL eTRAKiT Inspection 6/21/2022 7:59 AM Refugio Camilo <br /> Request Please call one hour before stopping by <br /> Contact Name:Refugio Camilo <br /> Site Address: 1410 119TH PL SE <br /> Phone:4259489487 <br /> e-Mail:info@drcconstruction.net <br /> 6/22/2022 6/22/2022 PERMIT CRB EXTENSION A (6/22/2022 1:10 PM CRB) <br /> EXTENSION REFUGIO WITH DETOUR <br /> REMODELING NEEDS MORE TIME <br /> DUE TO COVII--425-948-9487 <br /> INSP12 Y S TE M S <br />
The URL can be used to link to this page
Your browser does not support the video tag.