Laserfiche WebLink
STD. <br />SHEARWALL <br />RIMJOIST TO BE IY2'v MIN <br />THICKNESS AT ALL <br />SHEARWALLS <br />,ELEVATION N/___RIM <br />EDGE NAILING TO POSTS4 <br />TRIM STUDS, AND KING <br />STUDS <br />Onr-MRVVALL %,AltLt® @BEARING STUD FOR <br />(E) TOP PLATE SPLICE NAILING TO 13E (8) 16d HEADER <br />SINKERS (MIN). LAP 48" MINIMUM, <br />CENTER SPLICE ON STUDo <br />STD. SHEARWALL ELEVATION WJO RIM <br />SCALE: X'=19-0" <br />(JD <br />0 <br />< <br />coo <br />-6 <br />:3 <br />U) <br />N@6 DOW By RGVWA <br />N- <br />0 <br />> <br />N <br />< <br />co <br />Z <br />2 <br />o <br />7z <br />tr <br />7 <br />�,343 Wed <br />JUL, 1 3 2021 <br />:STRUCTURAL <br />DETAILS <br />S-6.0 <br />