Laserfiche WebLink
ATTICVENTIN6� <br />T311•-7.8 44AN-PPAIL <br />CONTINUOUS 1-1/4" - 2" <br />VIAMETER OANV.AIL <br />`REQUIPEV ON AT LEAST ONE <br />SIVE ANV TO DIE 133ETWEEN 34" <br />{ENV 35" VE-RTICALL`( ¢tWVE <br />TR VS zzz <br />LSC CONNECTOR <br />OR �QU�L <br />-.311•7•5 <br />'PIS:R S- -ALL 13E NO WI07-:6 T}}AN -7.-7511 <br />-TREfAV S44ALL a:E NO LESS T44-AN 10" <br />:ExcEEP T+I:E SM-ALLLT 13Y MO-R:E 1-4 %8" <br />3/6" -1/2"TOOF OS13 <br />NAIL:EV ed AT V" O,C, :EV(�E <br />ANV 12" O,C, FitLV 11, <br />SIMTSON 441 <br />-lU.RIC{AN:E CL: <br />AT EAST-A,FT� <br />3/2)" -1/2" WALL C <br />NAILEP Sd AT CV <br />-LN n / 2'1 O,C, -r--ry <br />'PA1 TEPS ANP TPUSSSES <br />'P:6R'PLAN 07,"i-R(.ASS IM-FG� <br />VfFULTEV NAT:T:E�R) CEILING <br />TO 44Av1E".-3813-ATTS <br />,EILIN6 TO 44Av:ET 4,1 <br />3LOWN IN INSULATION <br />TOENAIL (5) 1(�d 13OX <br />OR IN COMMON <br />:EAC44 TRUSS 07, <br />TAFTI.R TO ?L,QT:E <br />(2) ON ONE SIVE ANV <br />(1) ON O_"DSITE SIVE <br />;.'PLAN <br />./}TAD WALLS TO 13:E <br />#2,AT 1V" O,C <br />WIT}}'.-21 13ATTS <br />FLL CONNECTIONS TAP <br />'POUBLE TO-F'PLA :E <br />WIT44 SPLICES OVbR STUDS <br />MIN 24" S?ACIN(i OF S?LIC:ES <br />NAILIN6?1RTA-DLE"RGP02.2(1) LINES12&13 <br />-1 l EA-P!ER i EP- i,LAN <br />T•Cv02.•75 <br />JACK ANV <br />KIND ST(UVS <br />/§LL CONNECTIONS 1'i�R TA`DL:6T(p( <br />-1(pd AT 1V O•C, SOLE <br />? LATF1 TO FOISTS OR <br />13LOCKIN6 * <br />JOIST -:ENNAIL (2) 1(pd <br />pUU13L <br />I- SO LE 'P LATIE p <br />7 ��1 TO? OF TO :w44 s-r p <br />STATRS <br />a�•3o2• r <br />MIN 1/2." 6W-D <br />UNpER STAIP_S <br />2x12 -pf#2 STRiNa R <br />SISTER 2x(� -FO. STR:6N6�T44 <br />� 1-3 iIPICAL STAIRS <br />WALL * <br />'.403.1.3.1 <br />MIN (1) No. 413{A`. VEP-TICAL <br />NOT mo?,f, T}{-AN 48" O,C, <br />EXTENpEp TO T44:E OTTOM <br />O'F ;=OOTIN , WIT44 <br />STANVA`.V OOK EXT:ENVIN6 <br />MIN 14" INTO STEM WALL, <br />NOT -FEWER T44AN (1) #4 `DAR <br />44O i zoNTAL WIT}l 12" o-F <br />`.31; TR:E{}T:EV SILL -PLATE <br />• T.A13 L:.4a3.1.Cv.1 <br />1/2." ANC44OP- FSOLT -7" INTO <br />CONCRET76 MAX 72" O,C• <br />MAX 12." �f OM WALL ENVS <br />TO? O'F STEM WALL ANV (1) T.50(o <br />#4 44oRizoNTAL 3-4" 1=ROlM 4" CONCRETE SLAB <br />WTTOM OF FOOTING . , a,..; ® `RSa�•2,3 <br />WAIN 4" D-ASE <br />;.•;;.sr.::d.•.ys;:;' COURS2E ANV <br />`R31�.1 (5) •,•`';.""_:,'.-a:..,..r:.,;r.,,:.�.:��.:�:� Cs,tmtm V��OR <br />WOOp fRA MINA TO 13:6 ::, : ' �I l i l lI TI-I I L®I l= l�I�®I • T �V�. <br />MIN V' ABOVE6PApE 1I®II1=•�. �a�';� �-II - �����I�h_ 13tTW�6N <br />OR 2 A'DOV� CO N C?- T� T I =I �I I--� A NV S L¢}-D <br />1 I I� I �I I 1 �'. ;a' ` • ®III®I I -� <br />I <br />Ivuvu- <br />P4a5 Nuuuuau I ' <br />.ftlNftGiE _ uuaa <br />�uuLlu <br />V <br />SVST:EM <br />uu <br />`RIM FOIST TOE NAIL:E <br />TO TO? 11LATE WIT{4 <br />gA AT (0" O.C. 11 <br />s#E-Ap- WALL s#EAT}}IN6 <br />LA?S`.IM JOIST <br />?LYWOOV FLOOP_VIA-P4RA6jM <br />6jLVEP AN-P NAIL:Ep WIT441-1/2." <br />TINE 0?, SCP:Ew S44AN K MIN <br />12-6 e 6i (0.0`6i ") S44A N K pl-A, <br />'FLOOP_JOISTS T: R?LAN <br />pOVDLE TO?'FLATE <br />WIT{} (2) 1Cad YEN-P NAIL <br />OR (3) 1COd TOE NAIL* <br />{ALL CONNECTIONS `P:E:R T/}13LE Rfva2.3(1) <br />ITEM <br />DESCRIPTION F BUILDING <br />NUMBER AND P F <br />SPACING I�� LOCATION <br />ELEMENT <br />FA TENERa, 11, c <br />Root <br />4-8d box (21/2" Y 0.113") or <br />1 <br />Blocking between ceiling joists or <br />3-8d common (21/2" x 0.131 "); or 3- <br />`roe nail <br />rafters to top plate <br />10d box (3" x 0.128"); or <br />3-" x 0.131" nails <br />4-8d box (2Y2' x 0.113" ), or <br />2 <br />Ceiling joists to top plate <br />3-8d common (2Y2" x 0.131"); or 3- <br />Per joist, toe nail <br />10d box (3" x 0.128"); or <br />3-3" x 0.131" nails <br />Ceiling joist not attached to parallel <br />4-10d box (3" � 0.128"); or <br />3 <br />rafter, laps over partitions <br />" . <br />3-16d common (3t2 x 0.162 ), or 4- <br />Face nail <br />(see section R802.5.2 and Table <br />3" 0.131 "nark <br />R802.5.2 <br />Ceiling joist attached to parallel rafter <br />4 <br />(heel joint) <br />Table R802.5.2 <br />Face nail <br />(see Section R802.5.2 and Table <br />R802.5.2) <br />Collar tie to rafter, face nail or 11/4' x 20 <br />4-10d box (3" x 0.128"); or <br />5 <br />3-10d common (3" x 0.148"); or 4-3" <br />Face nail each rafter <br />ga. ridge strap to rafter <br />x 0,131" nails <br />3-16d box nails (3%" x 0.135"); or 3- <br />2 toe nails on one side and 1 <br />Rafter or roof truss to plate <br />10d common nails (3"x0.148"); or 4- <br />toe nail onopposite side of <br />10d box (3" x 0.128"); <br />each rafter or truss <br />or 4-3" x 0.131" nails <br />4-16d (31/2" x 0.135"); or <br />3-10d common (3" x 0.148" ); <br />Toe nail <br />Roof rafters to ridge, valley or hip <br />or 4-10d box (3" x 0.128" ); or <br />7 <br />rafters or roof rafter to minimum 2" <br />4-3" x 0.131"nails <br />ridge beam <br />3-16d box 31/2" x 0.13 "); or <br />AA <br />2-16d common (3/2 x 0.162 ), or 3- <br />End nail <br />10d box (3" x 0.128"); or <br />3-3" x 0.131" nails <br />ITEM I <br />DESCRIPTION OF BUILDINGNUMBER <br />AND E O <br />SPACING N� LOCATION <br />ELEMENTS <br />A TENERa,',, <br />'mall <br />16d common (31/2" x 0.162") <br />24" o.c. race nail <br />8 <br />Stud to stud (not at braced wall panels) <br />10d box (3" x0.128"); or <br />1" o.c. face nail <br />3" x 0.131" nails <br />Stud to stud and abutting studs at <br />16d box (31/2" x 0.135"); or <br />12" o.c. face nail <br />0 <br />intersecting wall corners (at braced <br />3" x 0.131" nails <br />wall panels) <br />- <br />- <br />16d common (31/2" x 0.162r`) <br />16" o.c. face nail <br />Built-up header (2" to 2" header with %" <br />16d common (31/2" x 0.162") <br />16" o.c. each edge face nail <br />10 <br />spacer) <br />16d box (31/" x 0.135") <br />12" o.c. each edge face nail <br />5-8d box (21/2" x 0.11 3" ); or <br />11 <br />Continuous header to stud <br />4-8d common (2/2" x 0.131 "), or 4- <br />Toe nail <br />10d box (3" x 0.128") <br />16d common (3/2" x 0.162") <br />16" o.c. face nail <br />10d box (3" x 0.128" ); or <br />12" o.c. face nail <br />12 <br />Top plate to top plate <br />3" x 0.131" nails <br />8-16d common (31/2' x 0.162" ), or 12- <br />Face Hall on each side of end <br />13 <br />rouble top plate splice <br />16d box (31/2 x 0.135" ); or <br />' <br />joint (minimum 24" lap splice <br />12-10d box (3 x 0.128 ), or <br />length each side of end joint) <br />12-3" x 0.131' nails <br />Bottom plate to joist, rim joist, band <br />16d common (,.MY2'r x 0.162"] <br />16" o.c. race nail <br />16d box (1/2" x 0.135" ); or <br />12" o.c. face nail <br />14 <br />joist or blocking (not at braced wail <br />panels) <br />3' x 0,131" nails <br />Bottom plate to joist rim joist band <br />3-16d box (3''/2" x 0.135"); or <br />3 each 16" o.c. face nail <br />15 <br />' <br />joist or blocking (at braced wall panel) <br />2-16d common (31/2" x 0.1 2" ); or 4- <br />2 each 16" o.c. face nail <br />3" x 0.131" nails <br />4 each 16" o.c. face nail <br />4-8d box (2'Y2" x 0.113"); or <br />3-16d box (31/2" x 0.135"); or <br />4-8d common (2"Y2" x 0.131'); or 4- <br />Toe nail <br />10d box (3" x 0.128"); or <br />16 <br />Top or bottom plate to stud <br />4-3" x 0.131" nails <br />3-16d box (3J2" x 0.135"); or <br />2-16d common (3/2" x 0.162"); or <br />End nail <br />-10d box (Y x 0.128" ), or <br />3-3f, x 0.131" nails <br />Tofates, p p laps at corners and <br />3-10d box (3" x 0.12d8")y or <br />17 <br />intersections <br />, <br />2-16d common (3/2 x 0.162 ), or 3- <br />Face nail <br />3" x 0.131" nails <br />3-8d box (21/2" x 0.113" ); or <br />18 <br />1"bravo to each stud and plate <br />2-8d common (2Y2" x 0.131'); or 2- <br />Face nail <br />10d box (3" x 0.128'8)y or <br />2 staples 1 %' <br />3-8d box (2Y2" x 0.113" ), or <br />10 <br />1" � 6" sheathing to each bearing <br />2-8d common (2%2" x 0.131")y or 2- <br />"d <br />Face nail <br />0128" 1 Od box (3 x ) <br />.; or <br />2 staples, 1" crown, 16 ga., 13/4' long <br />3-8d box (21/2" x 0.113"); or <br />3-8d common (21/2" x 0.131'); or 3- <br />10d box (3" x 0.128" ); or <br />3 staples, 1 Fd crown 16 ga., 13/�" long <br />20 <br />1" x 8" and wider sheathing to each <br />Face nail <br />to „ Ad <br />bearing <br />x 4 - 1 x <br />Wider than 1 8 8d box (2/2 <br />0.113"); or <br />3-8d common (21/2" x 0.131'); or 3- <br />10d box W x 0.128"); or <br />4 staples, 1" crown, 16 ga., 13f" long <br />ITEM <br />DESCRIPTION <br />DESCRIPTION OF BUILDINGNUMBER <br />A PE F <br />SPACING I LOCATION <br />F TENERa,b,a <br />Floor <br />4-8d box (21/2" x 0.113r'); or <br />21 <br />Joist to sill, top plate or girder <br />3-8d common (21/2" x 0.131"); or 3- <br />Toe nail <br />l ad box (3" x 0.128" ); or <br />3-3' x 0.131' nails <br />8d box (2/2" x 0.113") <br />4' o.c. toenail <br />22 <br />Rim joist, band joist or blocking to Sill or <br />8d common (2"Y2" x 0.131 "); or 10d <br />top plate (roof applications also) <br />box (3" x 0.128" ); or <br />6" o.c. too nail <br />3' x 0.131" nails <br />3-8d box (21/2" x 0.113"); or <br />23 <br />1 " 6" subfloor or less to each joist <br />2-8d common (2Y2" x 0.131 "); or 3- <br />Face nail <br />10d box (3" x 0.128"); or <br />2 staples, 1" crown, 16 a., 13/" long <br />24 <br />2" subfloor to joist or girder <br />3-16d box (31/2" x 0.135"); or <br />Mind and face nail <br />2-16d common 3/2 0.162 <br />25 <br />2" planks (plank & beam -floor & roof) <br />3-16d box (31/2" x 0.135" ), or <br />At each bearing, face nail <br />2-16d common 31/2" x 0.162" <br />3-16d common (31✓2" x 0,162") 4-10 <br />26 <br />Band or rim joist to joist <br />box (3" x 0.128"), or <br />End nail <br />4-3" x 0.131" nails, or <br />4-3" x 14 ga. staples, 7/16" crown <br />Marl each layer as follows. 32" <br />20d common (4" x 0.102"), or <br />o.c. at top and bottom and <br />sta er d . <br />10d box (3" x 0.128"'); or 3" x 0.131 fA <br />24" o.c. face nail at top and <br />27 <br />Ptrilt®tip girders aria beams, 2-inch <br />nails <br />bottom staggered onopposite <br />lumber layers <br />And: <br />2-20d common (4" x 0.1 92"), or <br />Face nail at ends and at each <br />3-10d box (3" x 0.128"); or <br />splice <br />3-3" x 0.131" nails <br />4-16d box (31/2" x 0.135"); or <br />28 <br />Ledger strip supporting joists or rafters <br />3-16d common (31/2" x 0.162"); or 4- <br />At each joist or rafter, face nail <br />10d box (Y x 0.128" )y or <br />4-3" x 0.131" nails <br />2-10d box (3" x 0.128"), or <br />29 <br />Bridging or blocking to joist <br />2-8d common (2MV x 0.131 "; or <br />Each end, toe nail <br />2-3" x 0.131'; nails <br />IYiN <br />M <br />DESCRIPTION OF BUILDING <br />ELEMENTS <br />NUMBER AND TYPE OF FASTENER", <br />Wood structuralsubfloor, roof <br />sheathing <br />,see Table R602.3(3) for wood structural panel exterior wall sheathing to wall framing] <br />6d common (2" x 0.113") nail (subfloor, <br />%ft-1/2r, wall)' 8d common (2Y2" x 0.131 ") nail <br />(roof); or R R -01 (2%' x 0.113") nail <br />(roof) <br />6 <br />in <br />31 10/32"®1" 8d common nail (2Y2" x 0.131"); or R R � 6 121 <br />01; (2/u" x 0.113") nail (roof) <br />32 1%"_11/:" 10d common (3" x 0.148") nail; or 8d <br />(21/2' - 0.131 ") deformed nail 6 12 <br />Other wall sheathingu <br />1/2" structural cellulosic fiberboard 1 Y2" galvanized roofing nail, 7/16" head <br />33 sheathing diameter, or 1'/4" long 16 ga. staple with 3 6 <br />7/16" or 1" crown <br />25/32" structure! cellulosic fiberboard 13/4" galvanized roofing nail, 7/16" head <br />34 sheathing diameter, or 1'Y2" long 16 ga. staple with 3 6 <br />7/16" or 1" crown <br />11/2" galvanized roofing nail; staple <br />35 1/2" gypsum sheathing' galvanized, 11/2" long; 11/4" screws, Type 7 7 <br />W or <br />1%" galvanized roofing nail; staple <br />36 ifs" gypsum sheathing' galvanized, I%' long; 1%' screws, Type 7 7 <br />W or <br />Wood structural panels, combination subfloor un erlayment to framing <br />6d deformed (2" x 0.120") nail; or 8d <br />37 3✓4" and less 6 12 <br />common (21/2" x 0.131') nail <br />38 l3"�1 Ad 8d common (21.�2' x 0.131 ") nail; or 8d 6 12 <br />deformed (21ra" x 0.120") nail <br />30 1 /"- 11/4't <br />10d common (3" x 0.148") nail; or 8d 6 12 <br />deformed (21/2" x 0.120") nail <br />For SI: 1 inch = 25.4 rum, 1 foot = 304.3 mm, 1 mile per hour = 0.447 m/s; 1 ksi = 6.595 MPa. <br />a.Nails are smooth -common, box or deformed shanks except where otherwise stated. Nails used for framing and sheathing connections shall <br />have minimum average bending yield strengths as shown: SO ksi for shank diameter of 0.192 inch (20d common nail), 90 ksi for shank <br />diameters larger than 0.142 inch but not larger than 0.177 inch, and 100 ksi for shank diameters of 0.142 inch or less. <br />b.Staples are 16 gage wire and have a minimum 7/16-inch on diameter crown width. <br />c.Nails shall be spaced at not more than 6 inches on center at all supports where spans are 48 inches or greater, <br />d.Four-foot by 8-foot or 4-foot by 9-foot panels shall be applied vertically. <br />e. Spacing of fasteners not included in this table shall be based on Table R602.3(2). <br />f.For wood structural panel roof sheathing attached to gable end roof framing and to intermediate supports within 45 inches of roof edges and <br />ridges, nails shall be spaced at 6 inches on center where the ultimate design wind speed is less than 130 mph and shall be spaced 4 inches on <br />center where the ultimate design wind speed is 130 mph or greater but less than 140 mph. <br />g.Gypsum sheathing shall conform to ASTM C1396 and shall be installed in accordance with GA 253. Fiberboard sheathing shall conform to <br />ASTM C20S. <br />h.Spacing of fasteners on floor sheathing panel edges applies to panel edges supported by framing members and required blocking and at floor <br />perimeters only, Spacing of fasteners on roof sheathing panel edges applies to panel edges supported by framing members and required blocking. <br />Blocking of roof or floor sheathing panel edges perpendicular to the framing members need not be provided except as required by other <br />provisions of this code. Floor perimeter shall be supported by framing members or solid blocking. <br />i.Where a rafter is fastened to an adjacent parallel ceiling joist in accordance with this schedule, provide two toe nails on one side of the rafter <br />and toe nails from the ceiling joist to top plate in accordance with this schedule. The toe nail on the opposite side of the rafter shall not be <br />required. <br />j.RSRS-01 is a Roof Sheathing Ring Shank nail meeting the specifications in ASTM F1667. <br />�s <br />mF <br />d# <br />� <br />k ' <br />.F • <br />R <br />�, 3, it <br />} <br />-4sREVISED <br />04-23-2022 <br />/ <br />