My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7018 BEVERLY BLVD 2022-07-20
>
Address Records
>
BEVERLY BLVD
>
7018
>
7018 BEVERLY BLVD 2022-07-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2022 2:31:31 PM
Creation date
7/20/2022 10:50:47 AM
Metadata
Fields
Template:
Address Document
Street Name
BEVERLY BLVD
Street Number
7018
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Element 13. Protect low impact development: <br /> ❑ BMP C102:Buffer Zones <br /> O BMP C103:High Visibility Plastic or Metal Fence <br /> O BMP C200: Interceptor Dike and Swale <br /> ❑ BMP C207:Check Dams <br /> ❑ BMP C208:Triangular Silt Dike(Geotextile Encased Check Dam) <br /> ❑ BMP C231:Brush Barrier <br /> e BMP C233 Silt Fence <br /> ❑ BMP C 234:Vegetated Strip <br /> 0 Other Per the SWMMWW: <br /> ❑ Not applicable to my proposed project <br /> Explain: <br /> Task 3: Construction SWPPP drawings <br /> Provide a Temporary Erosion and Sediment Control(TESC)plan for your project. <br /> r : <br /> • Show on your TESC Plan all BMPs selected above to satisfy the 13 Elements on your <br /> TESC Plan. <br /> • See City of Everett Public Works TESC Plan Example#103 <br /> everettwa.gov/DocumentCenter/View/7040 <br /> Note:Construction Stormwater Pollution Prevention Plans(Construction SWPPPs)that <br /> involve engineering calculations must also be prepared by or under the direction of a <br /> Washington State professional licensed engineer. <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report-Dec 2019 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.