Laserfiche WebLink
1511 <br /> DONE! <br /> You have now completed the Small Project Stormwater Report. <br /> Please review any sections you may have skipped to ensure all areas have been completed. <br /> Ensure the following attachments have been added: <br /> 8 Project Specific Stormwater Site Plan <br /> 8 Topographic Survey <br /> 8 Declaration of Covenant and Grant of Easement <br /> 8 Construction SWPPP Drawings <br /> 8 Map of Project Site Boundary and the Infiltration Infeasibility Mapping Results <br /> 8 Worksheet 3 —Sizing Justification Worksheet for your Selected BMP <br /> O Underground Injection Well (UIC) Registration* <br /> *You may need to register with the Washington State Department of Ecology at least 60 <br /> days prior to commencing UIC Construction.For more information,visit: <br /> everettwa.gov/1985/Stormwater-Technical-Resources <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report-Dec 2019 20 <br />