My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7018 BEVERLY BLVD 2022-07-20
>
Address Records
>
BEVERLY BLVD
>
7018
>
7018 BEVERLY BLVD 2022-07-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2022 2:31:31 PM
Creation date
7/20/2022 10:50:47 AM
Metadata
Fields
Template:
Address Document
Street Name
BEVERLY BLVD
Street Number
7018
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Notched Grade Board Trench <br /> For roof areas larger than 700 ft2,dispersion trenches with notched grade boards may be used with <br /> a total length not to exceed 50 ft. <br /> Notched Grade Board Trench Length(ft) = (10 ft)*(Roof Area to Trench(ft2)) <br /> 700(ft2) <br /> • Notched grade board trench length required: <br /> If greater than 50 feet needed more than one trench will be required <br /> • Number of notched grade board trenches required: <br /> • Length of each notched grade board trenches: <br /> ❑ See attached sketch. <br /> Splashblocks <br /> Splashblocks shall be designed in accordance with the SWMMWW.A maximum of 700 ft2 of roof <br /> area can drain to a single splashblock. <br /> • Roof area requiring mitigation: 2,385 <br /> • Roof area discharging to splashblock: 2,385 <br /> ❑ See attached sketch. <br /> BMP T5.10C Perforated Stub-out Connections <br /> Perforated stub-out connections shall be designed in accordance with the SWMMWW. <br /> • Roof area requiring mitigation (ft2): <br /> • Roof area discharging to perforated stub-out connection: <br /> • Perforated pipe length(ft): <br /> Perforated Pipe Length(ft) = (10 ft)*(Roof Area to Facility(ft2)) <br /> 5000(ft2) <br /> The minimum perforated pipe length shall be 10 ft. <br /> City of Everett Public Works <br /> Small Project Storm water Site Plan Report-Dec 2019 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.