My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7018 BEVERLY BLVD 2022-07-20
>
Address Records
>
BEVERLY BLVD
>
7018
>
7018 BEVERLY BLVD 2022-07-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2022 2:31:31 PM
Creation date
7/20/2022 10:50:47 AM
Metadata
Fields
Template:
Address Document
Street Name
BEVERLY BLVD
Street Number
7018
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 1. DETERMINE APPLICABILITY <br /> 0 Use the criteria below to determine if this template may be used for your project. If any <br /> criteria below are marked "False," this template may not be used and a report meeting <br /> Minimum Requirements#1-9 is required and shall be prepared by a professional Engineer <br /> licensed in the State of Washington. <br /> This project will create 2,000 square feet (ft2) or more,but less than 5,000 ft2, <br /> of new plus replaced hard surface area OR will have 7,000 ft2 or greater of land <br /> disturbing activities. <br /> This project does not drain to the combined sewer. <br /> This project converts less than 3/4 acre of existing soil cover or vegetation to <br /> lawn or landscape areas. <br /> This project will not adversely impact a water of the state. <br /> This project will not change a natural drainage course and will not generate any <br /> new concentrated flows leaving the site. <br /> This project will not be constructed within a critical area or a critical area buffer <br /> and will not adversely impact a critical area. See the City of Everett Municipal <br /> Code,Title 19.37. <br /> This project will follow the SWMMWW design criteria to satisfy Minimum <br /> Requirement #5 rather than an engineered design. <br /> What are the minimum technical requirements (MR) for a small project? <br /> ■ MR #1: Preparation of a Stormwater Site Plan (Report and Plans) <br /> ■ MR #2: Construction Stormwater Pollution Prevention Plan (SWPPP) <br /> ■ MR #3: Source Control of Pollution <br /> ■ MR #4: Preservation of Natural Drainage Systems and Outfalls <br /> ■ MR #5: On-Site Stormwater Management <br />
The URL can be used to link to this page
Your browser does not support the video tag.